Similar Projects
Elevated Water Storage Tank and Water Treatment Building
Infrastructure
Bidding
Ochlocknee, GA

North Fork Storage and Pump Station
New Construction, Infrastructure
Bidding
Atlanta, GA

Proposed 125,000 Gallon Elevated Water Storage Tank
Post-Bid
Less than $500,000 est. value
Pavo, GA 31778

Annual Water Tank Maintenance
Term Contract
Post-Bid
Waycross, GA 31501

Grand Center Water Tank Rehabilitation
Results
Less than $235,000 est. value
Chickamauga, GA 30707

World-Wide Water Storage Tank Remediation
Term Contract
Results

Elevated Tank Maintenance Program
Infrastructure
Bidding
GA

Mcneal Drive Elevated Water Tank
Post-Bid
Douglas, GA 31533

Replace Water Tank At Camp Oliver
Results
$500,000 to $1,000,000 est. value
Fort Stewart, GA 31314

Bloomingdale 400,000 Gallon Elevated Water Storage Tank
Post-Bid
Savannah, GA

Water Distribution System Improvement - Phase 2
Results
Less than $1,410,818 est. value
Jefferson, GA

Elevated Tank Rehabilitation
Renovation
Post-Bid
Georgetown, GA

Georgia Water System Tank and Valve Improvements
Results
Less than $621,333 est. value
Palmetto, GA 30268

Elevated Water Tower
Post-Bid
Dudley, GA

Elevated Tank Renovation and Repainting
Results
Less than $200,000 est. value
Crescent, Eulonia, Townsend, GA

Last Updated 11/19/2021 05:14 AM
Project Title

Jones Bridge Water Tanks Rehabilitation

Physical Address View project details and contacts
City, State (County) Johns Creek, GA 30022   (Fulton County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Jones Bridge Water Tanks Rehabilitation involves interior and exterior abrasive blasting and recoating with minor repairs. Both tanks will be thoroughly cleaned. A cathodic protection system will be required to be installed on both tanks. Both Jones Bridge Water Tanks will require the installation of an anchorages for a personal fall arrest system safety devices at all ladders and modifications to the catwalks. The fine mesh screen on the ventilation structure shall be replaced.

Details

Division 09 - Finishes, Painting and Coating.
Division 13 - Special Construction.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents