Similar Projects
Last Updated | 10/17/2023 09:03 PM |
Project Title | Wastewater Treatment Plant No. 1 Fence Replacement |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX 77002 (Harris County) |
Category(s) | Single Trades |
Sub-Category(s) | Fencing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $325,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ID:10486 - Wastewater Treatment Plant No. 1 Fence Replacement Estimate: $325,000 Type: Fence replacement of WWTP 1, Lift Station Nos: 2, 3 & 8 fences with Masonry Fence Owner: Harris County MUD No. 165 The scope of work is to replace the existing wire or wodden fences at the HC MUD 165 WWTP 1 and Lift Stations 2, 3 & 8 within the district. For the WWTP 1 fence the existing wire fence around three sides of the plant is to be removed and replaced by an 8 foot tall blockwork fence matching the color of the existing blockwork fence along the Greenhouse Blvd side of the plant. For the Lift Stations the existing wooden or wire fences are to be removed and replaced by an 8 foot tall blockwork fence matchingthe color of the surrounding existing fences. The gates for all three lift stations are to be replaced by a set of two 8 foot high metal gates as shown on the plans. These gates must be opaque. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |