Similar Projects
North Milwaukee Avenue Multi-Residential Development
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Chicago, IL 60642

Gethsemane Garden Center Expansion
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Chicago, IL 60660

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

Elizabeth Street Life Sciences Lab
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Chicago, IL 60642

AutoZone #3567 / Chicago
New Construction, Infrastructure - 30,000 SF
Bidding
$8,000,000 CJ est. value
Chicago, IL 60632

119th Place Green Alley Reconstruction and Bioswales
Infrastructure
Bidding
$500,000 CJ est. value
Blue Island, IL 60406

2021 Courtyard Improvements
Post-Bid
Tinley Park, IL 60477

Jefferson Site Improvements
Infrastructure
Post-Bid
River Forest, IL

Site Reconstruction
Results
Streamwood, IL 60107

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

St. Alexius Medical Center Addition
Addition, Infrastructure, Renovation - 29,000 SF
Construction
$14,000,000 CJ est. value
Hoffman Estates, IL 60169

210 N Aberdeen Mixed-Use
New Construction, Infrastructure - 10,700 SF
Construction
$140,000,000 CJ est. value
Chicago, IL 60607

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Wabash Avenue Mixed-Use Development
New Construction, Infrastructure - 3,160 SF
Pending Verification
$68,000,000 CJ est. value
Chicago, IL 60605

Illinois Medical District Block - Phase 3 (Harrison Tower)
New Construction, Infrastructure - 30,000 SF
Design
$36,000,000 CJ est. value
Chicago, IL 60604

Last Updated 09/27/2022 11:01 PM
Project Title

Jardine Water Purification Plant (JWPP) and Sawyer Water Purification Plant (SWPP) Phosphate System Modifications

Physical Address View project details and contacts
City, State (County) Chicago, IL 60649   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $22,852,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Deadline for Questions 05-May-2022 16:00:00 CONTRACT SPECIFIC GOALS: 26% MBE 6% WBE 0% VBE Project Location: The work is located at two locations: Jardine Water Purification Plant, 1000 East Ohio Street, Chicago, IL 60611 and Eugene Sawyer Water Purification Plant, 3300 East Cheltenham Place, Chicago, IL 60649. The work areas include but not limited to the following areas shown on the Drawings: a. Jardine Water Purification Plant: 1) Chemical Storage Area at elevations -15.00 and 10.00 2) Chemical Feed Day Tank Area at elevations 38.00 and 51.00 3) Chemical Application Rooms at elevation 25.00 4) Chemical Area at elevation 14.50 5) Chemical Receiving Area at elevation 5.35 b. Sawyer Water Purification Plant: 1) Low Lift Pump Discharge Pipe Room at elevation -14.25 2) Basin No. 3 Gallery at elevation -2.00 and Filter Pipe Gallery No. 4 at elevation -14.00 3) Coagulating Basin Area at elevation 17.00 4) West Filter Gallery at elevation 6.00 5) Low Lift Pumping Station at elevation -24.00 6) Chemical Building at elevation 24.00 7) Low Lift Pump Electrical Room at elevation -14.25 8) Basin No. 1 Gallery at elevation -12.00 and Filter Pipe Gallery No. 1 at elevation -14.00 urnish all labor, materials, equipment and incidentals required and perform the JWPP and SWPP Phosphate System Modifications Project, City of Chicago Department of Water Management (CDWM) Project No. 20303 and 20203 in its entirety as shown on the Drawings, as required by Book 1 - Terms and Conditions for Construction and other Work indicated in the Contract Documents, and as specified herein. a. Jardine Water Purification Plant: 1) Provide modifications to the existing blended polyphosphate fill station and bulk storage tank feed piping. 2) Remove and dispose of existing level sensors system including all conduit and wiring back to source from bulk storage tanks. Remove and salvage existing blended polyphosphate mixers. 3) Clean, inspect, repair, and furnish modifications to four existing concrete bulk blended polyphosphate bulk storage tanks to install new PVC bag liner system, piping, valves, and appurtenances for phosphoric acid bulk storage. 4) Remove and dispose of existing blended phosphate system transfer pumps, equipment pads, piping, valves, day tanks, electrical equipment, conduit and wiring, and controls. Remove and salvage existing blended polyphosphate feed pumps. 5) Provide four phosphoric acid transfer pumps, associated piping, valves, appurtenances, electrical equipment, instrumentation, and controls and SCADA integration and programming. 6) Provide two filtered water collector phosphoric acid day tanks, associated piping, valves, appurtenances, electrical equipment, instrumentation, and controls, and SCADA integration and programming. 7) Provide five filtered water collector phosphoric acid feed pump skids, associated piping, valves, appurtenances, electrical equipment, instrumentation, and controls. 8) Provide two rapid mix phosphoric acid day tank support structures and incidentals. 9) Remove, modify, and install rapid mix day tank area hand railings. 10) Provide four rapid mix phosphoric acid day tanks, associated piping, valves, appurtenances, electrical equipment, instrumentation, and controls, and SCADA integration and programming. 11) Provide ten rapid mix phosphoric acid feed pump skids, associated piping, valves, electrical equipment, instrumentation, and controls, and SCADA integration and programming. 12) Provide flow meters for phosphoric acid feed application points, and SCADA integration and programming. 13) Provide chemical containment curbs and protective coatings at bulk tank, day tank, and feed pump locations. 14) Design and construct pipe hangers and supports. 15) Provide coating systems on piping, valves, and equipment. 16) Provide modifications to existing substation, associated conduit, wiring, and incidentals. 17) Provide new motor control center, associated conduit, wiring, and incidentals. 18) Provide modifications to existing switchboards SWBD-AB-2E and SWBDAB-2W associated conduit, wiring, and incidentals. 19) Provide new panelboards, associated conduit, wiring, and incidentals. 20) Provide new network and SCADA equipment into existing control room, associated conduit, cable, and incidentals. 21) Provide new network in existing control room cabinet, and throughout plant including associated conduit, cable, and incidentals. 22) Provide system integration services to integrate, program, test, and commission new PLC's, OIT's, updating existing SCADA workstations, updating existing SCADA servers to operate with CDWM's existing SCADA system. 23) Provide testing and startup for all electrical equipment, pumps, tanks, valves, control equipment, and SCADA. 24) Furnish operational instruction and operation / maintenance manuals for all electrical equipment, pumps, tanks, valves, and control equipment. 25) Furnish spare parts and accessories as required in Contract Documents. Sawyer Water Purification Plant: 1) Remove and dispose of existing caustic soda bulk storage tank fill station and fill piping, valves, appurtenances, and control panel. 2) Remove and dispose of four existing abandoned caustic soda bulk storage steel tanks, transfer pumps, equipment pads, piping, valves, day tanks, electrical equipment, conduit and wiring, and controls. 3) Remove and dispose of two existing blended polyphosphate bulk storage stainless steel tanks, piping, valves, electrical equipment, conduit and wiring, controls, and platforms. 4) Remove and dispose of existing blended polyphosphate feed pumps, transfer pumps, feed piping, valves, day tanks, electrical equipment, conduit and wiring, and controls. 5) Remove and dispose of existing pilot testing phosphoric acid feed pumps, storage totes, piping, valves, electrical equipment, conduit and wiring, and controls. 6) Remove and dispose of existing lime feed pumps, day tanks, equipment pads, piping, valves, electrical equipment, instrumentation, conduit and wiring, and controls. 7) Provide structural steel support system for four new phosphoric acid bulk storage tanks. 8) Furnish and construct on site four new steel phosphoric acid bulk storage tanks with PVC bag lining and appurtenances. 9) Provide modifications to access platforms for phosphoric acid bulk storage tanks. 10) Provide four transfer pumps, associated piping, valves, appurtenances, electrical equipment

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents