Similar Projects
The Spargo at Oxford Commons
New Construction, Infrastructure - 25,000 SF
Design
$6,000,000 CJ est. value
Oxford, MS 38655

N. A. Sandifer Bridge Maintenance
Infrastructure
Design
$615,136 CJ est. value
Monticello, MS 39654

Woodland Clinic Addition
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,052,000 CJ est. value
Woodland, MS 39776

Site Improvements at I-59 South Super Site
Infrastructure
Bidding
$400,000 CJ est. value
Ellisville, MS 39437

Clock Tower (Rebid)
New Construction, Infrastructure
Post-Bid
$2,034,805 CJ est. value
Winona, MS 38967

Industrial Site Grading
Infrastructure
Post-Bid
MS

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

Covered Arena Project
Results
$591,000 est. value
Winona, MS 38967

General Young Park Custom Shade Structure Project
New Construction
Construction
Aberdeen, MS

The Commons - Entertainment Block
New Construction - 28,359 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Oxford, MS

Parts Distribution Center - Navistar International Corp. / Olive Branch
New Construction, Infrastructure - 300,000 SF
Pending Verification
$10,000,000 CJ est. value
Olive Branch, MS 38654

Lake Okhissa Hotel and Conference Center Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Meadville, MS 39653

Landers Center Expansion
Addition, Demolition, Renovation, Infrastructure - 175,000 SF
Design
$35,000,000 CJ est. value
Southaven, MS 38671

North Apron Expansion, Phase 2
Infrastructure
Bidding
$200,000 CJ est. value
Kiln, MS 39556

Phase 1 Historical Rehabilitation, Wechsler School 1951 Addition
Addition, Demolition, Infrastructure
Post-Bid
$700,000 CJ est. value
Meridian, MS 39301

Last Updated 10/10/2022 02:34 PM
Project Title

New Concession Stand and Restroom Facility Wesson Park

Physical Address View project details and contacts
City, State (County) Saltillo, MS 38866   (Lee County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $765,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For questions related to the contract documents, contact DSJ Creative Designs, LLC at 662-231-9793. Proposals shall be submitted on the Bid Form provided with the bid documents. Bids may be submitted in person or, for those interested, bids can be electronically submitted at www.cityofsaltillomsbids.com under the project name. No oral, telegraphic, telephonic, or e-mail proposals will be considered. The current Certificate of Responsibility Number of the bidder shall appear on the outside of each sealed envelope containing a proposal, said envelope being plainly marked: NEW CONCESSION STAND & RESTROOM FACILITY, WESSON PARK, SALTILLO, MISSIS- SIPPI. This work consists of site work, plumbing and electrical, concrete slab on grade, cmu block construction with wood rafters, and metal roof, located within the City limits of Saltillo, Ms. Design intent is shown on Contract Documents. This Project is for the New Concession Stand & Restroom Facility at Wesson Park, Saltillo, Mississippi. The work will consist of removing the existing Restroom building, Site work, that will need to be coordinated with a Civil Engineer. Relocation of an existing septic tank and fill lines. Slab on grade construction with underground plumbing and electrical. CMU block construction, wood rafters and metal roof. Plumbing fixtures are to be "prison" style, as base bid, and a deductive alternate to show standard fixtures. LED lighting with occupancy sensors. Hollow Metal doors and frames. Roll up concessions window. Countertops. Bids must be submitted on the form furnished by the architect and must be accompanied by a Bid Bond, executed by both the bidder and an accepted surety; certified check or bank draft for five percent (5%) of the base bid payable to the City Clerk of Saltillo, Mississippi. Bid envelope must contain on the outside of the envelope, the contractor's current Certificate of Responsibility Number and the Contractor's License Number unless a statement on the exterior of the envelope says that the bid enclosed is less than or did not exceed $50,000.00. Envelope containing bid must be sealed, marked and addressed as follows: NEW CONCESSION STAND & RESTROOM FACILITY WESSON PARK SALTILLO, MISSISSIPPI By: Construction Company The total Contract Time shall not exceed 120 consecutive calendar days. Bids may be held up to 90 days from the date of opening for review of bids and qualifications of bidders prior to contract award. Award will be made to the LOWEST and BEST bidder. The Mayor and Board of Aldermen reserve the right to reject any and all bids and to waive any and all informalities. BY ORDER OF THE MAYOR AND BOARD OF ALDERMEN OF THE CITY OF SALTILLO,MISSISSIPPI.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents