Similar Projects
LED Smart Lighting and Smart County Systems
Bidding
Less than $176,516,780 est. value
Miami, FL 331281983

Design Build Solar Panel Installation at City Facilities
Bidding
South Miami, FL

MIA - AA Admiral Club Infrastructure and New Stair
Post-Bid
FL

Neon Light Repairs at Seminole Theatre
Post-Bid
Homestead, FL

Emergency Generator Backup Rehab. at North District
Results
Less than $950,000 est. value
Miami Beach, FL

Portable Generators
Results
FL

Installation of Solar Photovoltaic Systems
Bidding
Miami, FL

DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

LED Cylinder Lighting
Results
FL

Jackson Dade Head Start Electrical Meter Upgrade
Bidding
Less than $11,500 est. value
Miami, FL 33136

R-Panels for HES Building
Post-Bid
Homestead, FL

Generator Repair - Harris Field
Results
Homestead, FL

Lucy Substation Settings Change
Post-Bid
Homestead, FL 33030

Electrical Services Citywide
Term Contract
Results
Miami Beach, FL

CD 1.11 - Emergency Generators 1 thru 4 Rehab SDWWTP
Post-Bid
Less than $2,154,000 est. value
Miami, FL 33190

Reported 08/28/2019 12:00 AM
Project Title

Applicant Leasing Center ALC Generator

Physical Address View project details and contacts
City, State (County) Miami, FL 33125   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $180,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Replacement of an existing emergency generator with a new 100% capacity generator at 1407 NW 7 th St Miami, Florida 33125. Contractor is to remove the existing emergency generator and install a new generator as indicated in the drawings and specifications. Contractor shall supply necessary labor, materials and equipment for the total completion of the work, and must provide all documents to obtain the required permit in accordance with Building Codes. Contractor is responsible for the disposal of the removed debris every day and daily cleans up of the affected areas for this work, etc. All work shall be performed in the best standards of workmanship and shall be in accordance with Florida Building Code, all national, state, county, and municipal codes, rules, guidelines, regulations and departments having jurisdiction. Site 241
Details
Division 26 - Electrical, Packaged Generator Assemblies.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents