Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Water Heater Replacement
Alteration
Bidding
Denver, CO 80228

Replacement of Second Boiler at Historic Courthouse
Alteration
Bidding
CO

AFB 2141 CC 2018 Hail Damage Repairs
Post-Bid
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Greeley Central HS Boiler and DHW Replacements
Post-Bid
Garden City, CO 80631

SB267 Replace Boiler Economizer, Central Plant, CMHIP
Results
Less than $40,000 est. value
Pueblo, CO 81003

16" Sleeve Valve and Spool Refurbishment
Results
Berthoud, CO 80513

Water Purification System
Infrastructure
Bidding
Leadville, CO 80461

Cu Anschutz Pn19-129407-Scpp Pre-Qualified Only
Post-Bid
Less than $220,238 est. value
Denver, CO

SB267 Repairs/ Upgrades to Mechanical and Electrical Systems-Three Troop Offices / Adams
Results
$158,200 est. value
Commerce City, CO 80022

Elevator and Conveyance Inspection Services
Post-Bid
Brighton, CO

Refurbish Hydronic Heat System at Johnson Building
Results
Rangely, CO 81648

Boiler Replacement at Arvada Head Start
Post-Bid
Arvada, CO 80003

As-Needed HVAC, Mechanical and Plumbing Services
Term Contract
Results
Aspen, CO 81611

Reported 07/29/2021 01:24 PM
Project Title

Replace Campus Boilers - Five Buildings

Physical Address View project details and contacts
City, State (County) Alamosa, CO 81101   (Alamosa County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is an HVAC boiler replacement / upgrade project. The Adams State University campus underwent renovation that included new construction and HVAC components, including boilers, which are approaching their useful life expectancy. Existing boilers will be replaced with more efficient boilers to provide heating hot water to the HVAC systems in place. The boiler replacements will take place in five (5) separate buildings across campus.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents