Similar Projects
Circle K
New Construction - 5,200 SF
Conception
El Paso, TX

Murphy Express
New Construction - 2,800 SF
Conception
$500,000 to $1,000,000 CJ est. value
El Paso, TX 79902

Chain Link Fence
Infrastructure
Design
$400,000 CJ est. value
Socorro, TX 79927

RFQ D/B - El Paso Public Safety Training Academy and Fire Department Headquarters
Renovation, Infrastructure
Design
$33,000 CJ est. value
El Paso, TX 79905

RFQ Construction Manager-at-risk - Advanced Teaching and Learning Complex
Addition, Renovation, Infrastructure
Bidding
$52,400,000 CJ est. value
El Paso, TX 79968

North 1 Reservoir Roof Rehabilitation and Cielo Vista 0.1 MG Ground Storage Tank Replacement and Elevated Tank Ladder and Safety Improvements
Demolition, New Construction, Infrastructure
Bidding
$2,488,767 CJ est. value
El Paso, TX 79925

Crown Point II And Nevins Packed Tower Air Strippers
Infrastructure
Sub-Bidding
$2,263,816 CJ est. value
El Paso, TX 79925

IH0010 - Districtwide Crack Seal
Infrastructure
Sub-Bidding
$510,275 CJ est. value
El Paso, TX 79927

RFP D/B - El Paso VA New Health Care Center Fort Bliss
New Construction, Infrastructure - 492,996 SF
Post-Bid
$500,000,000 CJ est. value
El Paso, TX 79930

Drilling Services at El Paso, TX
Term Contract
Post-Bid
El Paso, TX

Modesto Gomez Park Improvements
Infrastructure
Results
$2,977,800 CJ est. value
El Paso, TX 79905

Delek Gas Station (Rebrands and Remodels)
Renovation
Results
El Paso, TX

Murphy Express #8954
New Construction - 2,800 SF
Construction
$1,100,000 est. value
El Paso, TX 79936

Circle K
New Construction - 5,200 SF
Construction
$1,200,000 est. value
El Paso, TX

Phase 1, Shell Building 'C' / Mountain Pass Business Park
New Construction, Infrastructure - 16,100 SF
Pending Verification
$1,460,000 CJ est. value
El Paso, TX 79925

Last Updated 08/16/2022 05:31 PM
Project Title

Jiffy Lube - Pebble Hills / El Paso

Physical Address View project details and contacts
City, State (County) El Paso, TX 79938   (El Paso County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $820,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 16, 2022, a general contractor has been awarded and construction is anticipated to start by late August, 2022.

Details

1 Story Above Grade, 4,042 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents