Similar Projects
Oakland Lake Park Pond Dredging
Infrastructure
Conception
Fort Worth, TX

Fy21 Houston Ship Channel Exxon to Carpenters - Dredging
Design
$5,000,000 to $10,000,000 est. value
Houston, TX

FY21 USACE Galveston District, Sabine-Neches Waterway (SNWW) Maintenance Dredging, Jefferson County, Texas Pipeline Dredging, Deep Draft
Design
$5,000,000 to $10,000,000 est. value
Galveston, TX

Houston Ship Channel Expansion Channel Improvement Project - Segment 3 Barbours Cut Channel Spilman Island and Morgans Point Bulkhead Walls
Term Contract
Bidding
$100,000,000 to $250,000,000 est. value
Houston, TX

Pipeline Dredging Deep Draft Houston Ship Channel - Greens Bayou to Sims Bayou, Harris County, Texas
Post-Bid
$5,000,000 to $10,000,000 est. value
TX

Dredging of Public Marina to Serve Sabine Pass Port Authority
Post-Bid
Sabine Pass, TX

FY20 Matagorda Ship Channel, Matagorda Peninsula to Point Comfort Texas, Pipeline Maintenance Dredging, Matagorda and Calhoun Counties, Texas.
Results
$5,000,000 to $10,000,000 est. value
Matagorda, TX

FY20 Matagorda Ship Channel, Matagorda Peninsula to Point Comfort Texas, Pipeline Maintenance Dredging, Matagorda and Calhoun Counties, Texas.
Results
$5,000,000 to $10,000,000 est. value
Matagorda, TX

Gulf Intracoastal Waterway, Texas Corpus Christi To Port Isabel, Pipeline Dredging
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Corp Christi, TX

Pipeline Dredging Deep Draft Houston Ship Channel Bayport To Morgans With Bayport and Barbours Flare Harris, County, Texas
Post-Bid
$10,000,000 to $25,000,000 est. value
TX

USACE Galveston District, Galveston Harbor and Channel in Galveston County, Texas, Deep Channel Pipeline Dredging
Results
$10,000,000 est. value
Galveston, TX

Single Award Task Order Contract (SATOC) for Matagorda Ship Channel - Peninsula to Point Comfort
Term Contract
Design
Less than $10,000,000 est. value
Point Comfort, TX 77978

Ship Dock Basin Maintenance Dredging
Post-Bid
Galveston, TX

Gulf Intracoastal Waterway, Texas, Freeport Harbor to Upper Matagorda Bay in Brazoria and Matagorda Counties, Texas, Pipeline Dredging.
Results
$5,000,000 to $10,000,000 est. value
TX

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract, No. 7-2022. Specification Nos. OM22007
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Mobile, AL - New Orleans, LA - Galveston, TX

Reported 03/10/2022 11:07 AM
Project Title

USACE Houston Ship Channel Sims To Turning Basin and Light Draft Channel Mechanical Dredging

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is for Deep and Shallow Draft Maintenance Dredging of the Houston Ship Channel (HSC) Sims to Turning Basin (Schedule 1 and Options 1-3). Schedule 1 includes dredging of approximately 600,000 cubic yards (CY) between Sims Bayou and the Main Turning Basin of the HSC. Option 1 is for maintenance dredging of the HSC Light Draft Channel for approximately 60,000 CY, Option 2 is for maintenance dredging of the Port of Houston docks located at Manchester and Turning Basin for approximately 250,000 CY, Option 3 is for maintenance dredging of the Brady Island Channel for approximately 10,000 CY. All material will be taken to House Tract Placement Area.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents