Similar Projects
Attic Insulation Ignition Barrier
Renovation
Post-Bid
$630,000 CJ est. value
Oxford, OH 45056

Siddall Hall Renovation
LEED Certification, Renovation
Post-Bid
$78,500,000 CJ est. value
Cincinnati, OH 45219

John Carroll University Dolan Hall Renovation
Renovation - 42,000 SF
Construction
University Heights, OH 44118

CWRU South Residential Campus - Phases I - II
New Construction
Pending Verification
Cleveland, OH 44106

CWRU South Residential Campus
New Construction, Infrastructure - 195,900 SF
Construction
$54,000,000 CJ est. value
Cleveland Hts, OH 44106

Esports Arena
New Construction
Conception
$28,000,000 est. value
Sandusky, OH

Siddall Hall Renovation
LEED Certification, Renovation
Post-Bid
$78,500,000 CJ est. value
Cincinnati, OH 45219

Cedarville University Residence Hall
New Construction, Infrastructure
Pending Verification
$34,200,000 CJ est. value
Dayton, OH 45402

Last Updated 11/10/2022 12:38 PM
Project Title

RFQ Design - Bryan Hall HVAC and Life Safety Upgrades 2022

Physical Address View project details and contacts
City, State (County) Athens, OH 45701   (Athens County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $8,400,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of the project is to upgrade the building HVAC equipment, bring chilled water to the building from the campus distribution, and to upgrade the life safety systems. The scope of the project will include bringing the chilled water distribution line from the campus loop to the building, the installation of a four pipe system, fan coil units, make-up air units, HVAC controls, upgraded fire alarm, and any associated architectural work to incorporate the new systems. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As of November 10, 2022, an issuance of short-list of firms have not been identified. The design firm selection timeline has not been released. Further details regarding design and construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents