Similar Projects
Commercial Mixed-Use
New Construction - 13,900 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Enterprise, Las Vegas, NV 89139

Commercial Building
Renovation - 9,600 SF
Design
Sunrise Manor, NV 89121

Honda East
New Construction, Renovation
Construction
Las Vegas, NV 89104

Chapman Ram Truck Center
New Construction, Renovation - 73,314 SF
Construction
$7,147,781 est. value
Las Vegas, NV 89121

Gaudin Porsche
New Construction - 46,909 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Las Vegas, NV

Maaco Town Center
New Construction - 10,313 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Las Vegas, NV

Vehicle Repair Facility
New Construction - 14,906 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Las Vegas, NV 89115

EchoPark Automotive
Renovation, Addition - 20,513 SF
Construction
Hawthorne, Henderson, NV 89014

Brake Repair Shop
New Construction - 4,040 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Las Vegas, NV 89178

Revere and Commerce Convenience Store
New Construction - 15,450 SF
Design
$1,000,000 to $5,000,000 CJ est. value
North Las Vegas, NV 89084

Centennial Subaru
New Construction - 63,930 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Las Vegas, NV

Vehicle Repair Shop
New Construction - 3,800 SF
Design
$500,000 to $1,000,000 CJ est. value
Enterprise, NV 89183

Auto Dealership
New Construction - 1,440 SF
Pending Verification
Less than $500,000 CJ est. value
Las Vegas, NV 89146

Vehicle Repair Facility
New Construction - 17,500 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Las Vegas, NV 89115

Crane Sales and Storage Facility
New Construction - 7,500 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Las Vegas, NV 89115

Last Updated 06/14/2021 09:53 AM
Project Title

Sunset Maintenance Facility (SMF) Bus Wash Improvement Project

Physical Address View project details and contacts
City, State (County) Las Vegas, NV   (Clark County)
Category(s) Commercial
Sub-Category(s) Vehicle Sales/Service
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes, but is not limited to demolition of equipment, concrete pads, all existing bus was equipment removals, cleaning and preparing surfaces for epoxy and possible expansion of existing sump, the installation of all new bus wash equipment. The work includes providing a temporary bus wash station on the exterior of the existing bus wash building, possible upgrade of the existing electrical power and all related work.

Details

Vehicle Sales/Service, Renovation.
Division 01 - General Requirements, Summary, Contract Modification Procedures, Payment Procedures, Project Management and Coordination, Construction Progress Documentation, Photographic Documentation, Product Requirements, Closeout Procedures, Closeout Submittals, Operation and Maintenance Data, Project Record Documents, Demonstration and Training.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Miscellaneous Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 07 - Thermal and Moisture Protection, Fluid-Applied Waterproofing.
Division 09 - Finishes, Painting, Interior Painting.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Vocational Shop Equipment.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 22 - Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Facility Drainage Piping Cleanouts, Plumbing Insulation, Plumbing Piping Insulation, Facility Sanitary Sewerage, Sanitary Waste Piping Specialties, Sanitary Drains, Facility Storm Drainage, Facility Storm Drains, Facility Trench Drains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Breechings, Chimneys, and Stacks.
Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Raceway and Boxes for Electrical Systems, Interior Lighting.
Division 33 - Utilities, Storm Utility Water Drains, Utility Trench Drains.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents