Reported 01/14/2022 12:00 AM
Project Title

R1 Ps I-76 Bridge Replacement at York And Resurfacing-York to Dahlia Cm, Ci and Mt

Physical Address View project details and contacts
City, State (County) (Adams, Arapahoe, Clear Creek, Denver, Douglas, Gilpin, Jefferson Counties)
Category(s) Professional Services
Sub-Category(s) Engineering, Inspection Services
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct the asphalt pavement sections of roadway starting west of York St. to Dahlia St. with concrete pavement on I-76 for both directions. And, replace the existing bridge structures at I-76 and York St. with a single bridge structure. An auxiliary lane will be added to westbound I-76 between SH-224 and I-270, and a second lane will be added to the westbound I-76 On-Ramp from SH-224 tying to the auxiliary lane. There will be bridge preventative maintenance, such as removal and replacement of expansion devices, SMA, guardrail, and bridge rail, on the bridge structures over the South Platte River, RTD line, and SH- 224. Replace guardrail along the project and improve permanent water quality features off the highway. Numerous other ancillary work items including but not limited to: Embankment material, detour paving, base course material, striping, signing, erosion control, traffic control, bridge rail, guard rail, and lighting

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents