Similar Projects
DuPont Kalrez Manufacturing Phases I & II
New Construction, Addition - 102,910 SF
Design
$45,000,000 est. value
Newark, DE 19711

Oak Grove Mobile Home Park Watersystem Upgrades
Renovation
Post-Bid
Dover, DE 19901

Last Updated 12/06/2019 03:09 PM
Project Title

Fabrication of Bus Stop Awaiting Shelters

Physical Address View project details and contacts
City, State (County) Wilmington, DE 19800   (New Castle County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fabrication of modular passenger awaiting shelters per specifications listed, including all necessary hardware required to assemble structure on site. Six (6) shelter sizes are specified with different configurations, it is possible that additional sizes and designs may be needed for specific locations. Manufacture will ship pre-fabricated modular shelter structures from their location to sites described herein.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents