Similar Projects
Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Design
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Design
Hines, IL 60141

Furnace Inspection & Cleaning at Various Sites
Term Contract
Post-Bid
Evanston, Wheeling, IL

Boiler Tune-up at Various Locations
Post-Bid
Arlington Heights, Des Plaines, Evanston, Ford Heights, Franklin Park, Niles, Park Forest, Robbins, Wheeling, IL 60016

HVAC Equipment Replacement
Results
Evanston, IL 60201

2020 HVAC Replacement
Results
Wheeling, IL 60090

HVAC Maintenance
Term Contract
Post-Bid
Mount Prospect, IL 60056

Campus Building Automation System Upgrade
Results
$600,000 to $700,000 est. value
Chicago, IL 60621

ABB HVAC Drivers
Post-Bid
Chicago, IL 60602

Chiller Bundle Repair and Replacement
Results
Chicago, IL 60622

Heating Small Construction Repairs in the Emergency Heating Repair Program - JOC
Term Contract
Post-Bid
Less than $1,800,000 est. value
Chicago, IL 60602

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Service Contract for Heating, Ventilating, Air Conditioning and Temperature Controls
Term Contract
Post-Bid
Calumet City, IL 60409

HVAC Maintenance
Term Contract
Results
Riverdale, IL 60827

Boiler 1 And 3 At Dusable High School
Post-Bid
Chicago, IL 60615

Reported 09/23/2021 12:00 AM
Project Title

HVAC Replacement and Toilet Room Remodeling

Physical Address View project details and contacts
City, State (County) Norridge, IL 60706   (Cook County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) HVAC, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work in general includes, but is not limited to, demolition and removal of casework, walls, doors, flooring, lighting, mechanical equipment, ductwork, plumbing fixtures, and all associated work. all as part of HVAC system replacement throughout the building and select toilet and changing room remodeling.

Details

Restroom/Bath House, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents