Project Title | Laurel Avenue, City Hall Parking Lot and Lakefront Park Trail Improvements |
Physical Address | View project details and contacts |
City, State (County) | Hudson, WI 54016 (Saint Croix County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $700,000 [brand] Estimate |
Plans Available from | Civil Engineer - 04/19/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Laurel Avenue from Blakeman Blvd, just south of Prospect Park, to 11th Street. City Hall parking lot in downtown Hudson located on 3rd Street between Walnut Street and Locust Street. Trail located in Lakefront Park behind the bandshell from the beach house parking lot on the north end to Walnut Street on the south end. consisting of the major work items in the following approximate quantities: Remove Asphaltic Surface: 2,220 square yards Full Depth Reclamation: 8,100 square yards Remove Manhole/Catch Basin: 11 each Remove Light Pole/Lighting Unit Type Special:1 each Salvage and Reinstall Light Pole: 4 each Base Aggregate Dense 1 1/4 -Inch: 370 cubic yards HMA Pavement: 2,300 tons 6" Gate Valve and Box: 2 each 6" DIP Class 52: 32 linear feet Precast Manhole: 9 each Concrete Curb and Gutter: 800 linear feet Concrete Sidewalk 6": 2,000 square feet Marking Line Grooved Wet Ref Epoxy 4": 7,600 linear feet Along with other appurtenant construction items. This project includes funding from the Local Road Improvement Program (LRIP). |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |