Similar Projects
CTH C/ Wilmot Road
Infrastructure
Bidding
$1,400,000 CJ est. value
Bristol, WI 53104

Line of Sight Reconstruction Parking Ramps 38 and 63
Infrastructure
Sub-Bidding
$75,000 CJ est. value
Madison, WI 53715

Beloit Readiness Center Construct Trash Enclosure
Alteration
Post-Bid
Beloit, WI 53511

Concrete Replacement Program
Alteration
Post-Bid
Sturgeon Bay, WI

Townhomes at Carver Park - Metal Roofing, Landscaping, Concrete Repairs and Sidewalk Mudjacking, Parking Area Improvements, Final Remodel Turnover Cleaning
Infrastructure, Alteration
Results
Milwaukee, WI

Building 3.1
Alteration
Results
Milwaukee, WI

Entrance and Terrace Renovation University Center University of Wisconsin - River Falls - GPC
Renovation
Construction
$359,817 CJ est. value
River Falls, WI 54022

Chiller #1 Overhaul Heating & Cooling Plant
Renovation
Construction
$96,975 CJ est. value
Kenosha, WI 53144

Government Center - Footings and Foundation Bid Package 1
Infrastructure, Alteration
Post-Bid
Wautoma, WI 54982

Control Building Concrete
Alteration
Results
Fennimore, WI

Install Storm Sewer Piping
Infrastructure, Renovation
Construction
$178,689 CJ est. value
Fort McCoy, WI 54656

Concrete Pad for Recycling Facility
Alteration
Post-Bid
Pardeeville, WI 53954

2022 Concrete Repair Services
Alteration
Results
Janesville, WI

Engineering Hall Roof Replacement - General Bid
Renovation
Construction
$1,245,332 CJ est. value
Madison, WI 53706

Concrete Work
Alteration
Post-Bid
WI

Last Updated 05/10/2023 12:32 AM
Project Title

Laurel Avenue, City Hall Parking Lot and Lakefront Park Trail Improvements

Physical Address View project details and contacts
City, State (County) Hudson, WI 54016   (Saint Croix County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer - 04/19/23
Owner View project details and contacts
Architect View project details and contacts
Description

Laurel Avenue from Blakeman Blvd, just south of Prospect Park, to 11th Street. City Hall parking lot in downtown Hudson located on 3rd Street between Walnut Street and Locust Street. Trail located in Lakefront Park behind the bandshell from the beach house parking lot on the north end to Walnut Street on the south end. consisting of the major work items in the following approximate quantities: Remove Asphaltic Surface: 2,220 square yards Full Depth Reclamation: 8,100 square yards Remove Manhole/Catch Basin: 11 each Remove Light Pole/Lighting Unit Type Special:1 each Salvage and Reinstall Light Pole: 4 each Base Aggregate Dense 1 1/4 -Inch: 370 cubic yards HMA Pavement: 2,300 tons 6" Gate Valve and Box: 2 each 6" DIP Class 52: 32 linear feet Precast Manhole: 9 each Concrete Curb and Gutter: 800 linear feet Concrete Sidewalk 6": 2,000 square feet Marking Line Grooved Wet Ref Epoxy 4": 7,600 linear feet Along with other appurtenant construction items. This project includes funding from the Local Road Improvement Program (LRIP).

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents