Project Title | Bollman Water Treatment Plant Chemical Storage Improvements, Phase 2 and Seismic Strengthening - District Furnished Materials |
Physical Address | View project details and contacts |
City, State (County) | Concord, CA 94520 (Contra Costa County) |
Category(s) | Sewer and Water, Single Trades |
Sub-Category(s) | Service/Term Contracts, Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work Includes, but Is Not Limited to, Temporarily Removing Sludge Collector Equipment; Demolishing Embedded Pipe Supports; Temporarily Removing Existing Chemical Tanks; Demolishing Concrete Supports for Existing Tanks; Removing Pipe Supports, Chemical Piping, Valves, Fittings, Control Panels, and Instrumentation; Removing Abandoned Pipes and Electrical Conduits; Disposing of Removed Materials, Equipment, and Residual Chemicals Unless Otherwise Specified; Constructing Concrete Beams and Columns for Launder Column Bracing; Furnishing and Installing Safety Railings; Repairing and Patching Concrete Walls; Installing Seals Around Existing Pipe and Conduit Penetrations; Reinstalling Existing Sludge Collector Equipment; Constructing New Chemical Tank Pedestals and Anchors; Reinstalling Existing Chemical Tanks; Furnishing and Installing Chemical Piping, Fittings, Valves, Pipe Supports, Control Panels, and Instrumentation; Furnishing and Applying Coating on Existing Fiberglass Control Panel Enclosures; Installing Trench Drains and Storm Drain Pipes; Repurposing Existing Conduits and Conductors; Furnishing and Installing New Lining and Applying Exterior Coating on Existing Chemical Storage Tank; Furnishing and Applying Chemical Resistant Coating on Existing Concrete; Testing, Startup, and Re-commissioning of Existing Equipment That Are Re-installed as Part of Work; and Providing Training to District Staff for New Equipment. The Work Also Includes the Additional Work Described in Bid Item 5, but Only if and to the Extent Specifically Authorized in Writing by the Construction Administrator. The Location of the Project Site Is Bollman Water Treatment Plant in Concord, California. Project Is to Be Completed Within Five Hundred and Ninety Three (593) Consecutive Days From the Date Specified in the Notice to Proceed. Time for Commencement and Completion of the Work Is Important, and Is to Be of the Essence of the Contract. Bollman Water Treatment Plant Chemical Storage Improvements, Phase 2 and Seismic Strengthening. Furnishing All Labor, Materials, Except for Those Materials Supplied by the District as Set Forth in Paragraph 01010-4.0, District Furnished Materials, Equipment, and Performing All Work Necessary and Incidental to the Construction of the Project Known as the Bollman Water Treatment Plant Chemical Storage Improvements, Phase 2 and Seismic Strengthening Bidders Will Be Required to Submit a Fully Executed Disclaimer of Liability and Warranties Form to Receive the Download Link. The Electronic Version of the Contract Documents Is for Reference Only; the Half-size Hard Copy Contract Drawings Included With the Bidding Documents Shall Be the Version Used for Bid Calculation Purposes. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |