Similar Projects
Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Shoulder Widening, Pipe Work, Spot Grading; Replace Str (RCBC), Approach Grading
Infrastructure
Conception
$28,834,000 CJ est. value
Rapid City, SD 57702

Replace Str Bridge, Approach Grading, PCC Surfacing, Concrete Barrier, Approach Slabs, Guardrail, Lighting
Demolition, New Construction, Infrastructure
Design
$6,084,000 CJ est. value
Rapid City, SD 57701

North 80 Subdivision - Lot 8 & 9
New Construction, Infrastructure - 910,404 SF
Design
$49,000,000 CJ est. value
Rapid City, SD 57701

2023 Street Chip Sealing
Infrastructure
Bidding
$200,000 CJ est. value
Box Elder, SD 57719

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Enchantment Pressure Reducing Valve Facilities Short Term Piping Rehabilitation
Infrastructure
Post-Bid
Rapid City, SD

Water and Sewer System Repair
Infrastructure
Results
Box Elder, SD

Adams Street Water Main - West Boulevard North Thru Allen Avenue
Infrastructure
Results
Rapid City, SD 57701

Liberty Plaza Mixed Use
New Construction - 450,000 SF
Construction
$110,000,000 est. value
Box Elder, SD 57719

Block 5 Project
New Construction, Infrastructure - 7,000 SF
Construction
$60,000,000 CJ est. value
Rapid City, SD 57701

Healing Sanctuary
LEED Certification, New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hill City, SD 57745

Rushmore Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Rapid City, SD 57701

Grading, Interchange Reconstruction, PCC Surfacing
Infrastructure
Conception
$63,391,000 CJ est. value
New Underwood, SD 57761

Fountain Spring Business Park
New Construction, Infrastructure - 16,400 SF
Design
$2,000,000 CJ est. value
Rapid City, SD 57702

Last Updated 03/30/2023 03:34 PM
Project Title

Water and Sewer Improvements Block 13 Boulevard Addition

Physical Address View project details and contacts
City, State (County) Rapid City, SD 57701   (Pennington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Water and sewer improvements Block 13 Boulevard Addition. Utility improvements will be located in Quincy Street, Columbus Street, and the alley between Quincy and Columbus Streets.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents