Last Updated | 09/28/2023 09:23 PM |
Project Title | Asphalt Chiefs Camp |
Physical Address | View project details and contacts |
City, State (County) | Saint Joseph, MO 64501 (Buchanan County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $91,728 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A 5% bid bond in the amount of your bid is a requirement payable to MWSU. This project falls under the Missouri Prevailing Wage Rate Requirements. We reserve the right to accept or reject any or all bids. MWSU is an Equal Employment and Educational Opportunity Institution All questions should be directed to Purchasing Manager, Kelly Sloan, (816) 271-4465, purchase@missouriwestern.edu All work shall be in accordance with the attached proposal. o Contractor will be responsible for visiting the site to determine preparations, materials, labor, confirm measurements, and determine equipment required for completing quotation. o It is the Contractors responsibility to protect the surrounding area including but not limited to Spratt Stadium, existing concrete and asphalt, fencing, all structures. o The Contractor shall follow all applicable City, County, State, codes and regulations. o The Contractor will be responsible for all permits as needed to complete this project. o Contractor shall provide all tools and equipment that are necessary to complete the project. o Contractor is responsible for any trash, litter, or debris. o It is the responsibility of the contractor to locate all utilities if needed. o Grade existing gravel ensuring a minimum of 6" base compacted over entire area receiving asphalt. A. Approx. 27,040 sq. ft. B. This area will be marked with flags o Furnish and install 6" hot mix asphalt A. Approx. 27,040 sq. ft. B. This area will be marked with flags o Furnish 1/2 " rock to extend 4' on all edges where not flush with existing grade. o Match all existing concrete and asphalt where new and existing meet. o Work shall be completed by April 15, 2024 o All schedules shall be approved by the Physical Plant prior to work starting. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |