Similar Projects
Hyde Park Restroom - 319615 - City of St.Joseph
New Construction, Infrastructure
Conception
$482,820 CJ est. value
Saint Joseph, MO 64504

Rehabilitation General Aviation Apron - Phase 1 - 413020 - City of St.Joseph
Infrastructure
Conception
$5,000,000 est. value
Saint Joseph, MO 64504

RFQ Contractor - L455 Levee project
Infrastructure
Bidding
$5,000,000 CJ est. value
Saint Joseph, MO 64504

Herzog Warehouse
New Construction, Infrastructure - 72,800 SF
Bidding
$5,000,000 CJ est. value
Saint Joseph, MO 64503

Cross Country Track Dirt Work
Infrastructure
Post-Bid
Saint Joseph, MO 64507

476-L Andrew County Levee Rehab
Infrastructure
Post-Bid
$500,000 CJ est. value
Saint Joseph, MO 64503

Asphalt Repair and Replacement at Six District Sites
Infrastructure
Results
$477,000 est. value
Saint Joseph, MO

Back Road Expansion
Infrastructure
Results
$36,420 CJ est. value
Faucett, MO 64448

Red Lion Hotel Marriott Conversion / St. Joseph
Demolition, New Construction, Build-out, Renovation, Infrastructure
Construction
$45,000,000 CJ est. value
Saint Joseph, MO 64501

Hyde Park Cable-Stay Bridge - 2020 General Obligation Bond - City of St. Joseph
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Saint Joseph, MO 64501

Hyde Park Cable-Stay Bridge - 2020 General Obligation Bond - City of St. Joseph
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Saint Joseph, MO 64501

Northside Complex Splash Park - 250696 - City of Saint Joseph
Infrastructure
Conception
$2,000,000 CJ est. value
Saint Joseph, MO 64501

Runway 17-35 Reconstruction, Relocate Vehicle Service Outside Object Free Area, Rehabilitate Taxiway D, Install New FAA NAVAID Equipment
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Saint Joseph, MO 64503

Resurface
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
Saint Joseph, MO

Rosecrans Memorial Airport Air Traffic Control Tower - City of St. Joseph
New Construction, Infrastructure
Pending Verification
$2,500,000 CJ est. value
Washington Township, MO 64503

Last Updated 09/28/2023 09:23 PM
Project Title

Asphalt Chiefs Camp

Physical Address View project details and contacts
City, State (County) Saint Joseph, MO 64501   (Buchanan County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $91,728 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A 5% bid bond in the amount of your bid is a requirement payable to MWSU. This project falls under the Missouri Prevailing Wage Rate Requirements. We reserve the right to accept or reject any or all bids. MWSU is an Equal Employment and Educational Opportunity Institution All questions should be directed to Purchasing Manager, Kelly Sloan, (816) 271-4465, purchase@missouriwestern.edu All work shall be in accordance with the attached proposal. o Contractor will be responsible for visiting the site to determine preparations, materials, labor, confirm measurements, and determine equipment required for completing quotation. o It is the Contractors responsibility to protect the surrounding area including but not limited to Spratt Stadium, existing concrete and asphalt, fencing, all structures. o The Contractor shall follow all applicable City, County, State, codes and regulations. o The Contractor will be responsible for all permits as needed to complete this project. o Contractor shall provide all tools and equipment that are necessary to complete the project. o Contractor is responsible for any trash, litter, or debris. o It is the responsibility of the contractor to locate all utilities if needed. o Grade existing gravel ensuring a minimum of 6" base compacted over entire area receiving asphalt. A. Approx. 27,040 sq. ft. B. This area will be marked with flags o Furnish and install 6" hot mix asphalt A. Approx. 27,040 sq. ft. B. This area will be marked with flags o Furnish 1/2 " rock to extend 4' on all edges where not flush with existing grade. o Match all existing concrete and asphalt where new and existing meet. o Work shall be completed by April 15, 2024 o All schedules shall be approved by the Physical Plant prior to work starting.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents