Similar Projects
C1DA--EHRM Infrastructure Upgrade - Kansas City MO (Va-21-00035609)
Renovation, Infrastructure
Design
Kansas City, MO 64128

General Architectural and Engineering Services
New Construction
Bidding
Saint Louis, MO

Planning Consultant For Master Plan Update 2021
Term Contract
Bidding
MO

Engineering, Planning and Development Projects
Post-Bid

Engineering, Planning and Development Projects
Post-Bid

Architectural/Engineering Services
New Construction
Results
Caruthersville, MO

Conus Drilling Services - St. Louis District
Term Contract
Bidding

Parks and Recreation Master Plan
Renovation
Post-Bid
O'Fallon, MO

Drace Park Playground Improvements
Term Contract
Bidding
Town and Country, MO

Professional Engineering Services for the Ward and Persels Road Signal
Post-Bid
Lees Summit, MO

Fiscal Year 2022 Water Main Replacement Projects RFQ/P
Infrastructure
Bidding
Kansas City, MO

Lake City Valley Road over Small Creek Bridge - Bridge Evaluation
Post-Bid
Independence, MO 64055

Mid Rivers Mall Drive Signal Performance Measure Module
Infrastructure
Post-Bid
MO

Bryan Road and Wentzville Parkway Signal Performance Measure Module
Infrastructure
Post-Bid
Wentzville, MO 63385

Mainstage Roof Addition
Alteration
Post-Bid
$375,000 est. value
Washington, MO

Reported 07/16/2021 12:00 AM
Project Title

Professional Services - Historic Courthouse HVAC System Replacement

Physical Address View project details and contacts
City, State (County) Saint Charles, MO 63301   (Saint Charles County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work includes design and engineering services as well as prepare construction bid documents and perform construction administration for the replacement of the HVAC equipment at the Historic Courthouse. The current system utilizes 41 water source heat pump units with acooling tower (fluid cooler) and natural gas fired cast iron modular steam boiler. The County previously had a HVAC study on the systems and several options were provided. Those options have been narrowed to either a two pipe or four pipe system. The scope of this project may include but not be limited to the following: Direct replacement of Boiler, Cooling Tower, and Heat Pumps to replace all end of life equipment. Air cooled chiller and condensing boiler, with 4 pipe fan coil units.Evaluate the above options and determine cost impacts as well as disruption to the building and parking.Evaluate what additional equipment and or venting that may be needed to reduce humidity in the rotunda in conjunction with each proposed system. Design and Engineering of one of the above options. In each option the cooling tower must be relocated away from the historic building. The engineer must provide alternative location that may also include a recessed pit for the equipment. Preparation of bid documents as well as perform bid administration. Preparation of construction documents.Provide construction administration services for the installation of the designed system.

Details

Architectural, New Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents