Similar Projects
Samsung Electronics (Project Spring)
New Construction - 75,000 SF
Conception
$25,000,000 est. value
Goodyear, AZ 85340

Samsung Conductor Plant
New Construction
Conception
$17,000,000,000 est. value
Phoenix, AZ

Woolf Logistics Center - Shell Building
New Construction - 766,080 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Glendale, AZ 85301

Nammo Defense
New Construction - 119,268 SF
Design
Mesa, AZ 85215

Estrella Gin 2
New Construction
Post-Bid
Maricopa, AZ 85139

Park 303 - Buildings A & B
New Construction - 1,191,719 SF
Construction
$10,000,000 CJ est. value
Glendale, AZ 85340

FM Industries Facility Expansion
Renovation, Addition - 115,558 SF
Construction
$7,792,797 est. value
Phoenix, AZ 85009

Project Eagle Intel Fab 52 - Intel Semiconductor Manufacturing Expansion
New Construction
Pending Verification
$20,000,000,000 est. value
Chandler, AZ 85248

Watkins Cultivation - Phase I
New Construction - 31,875 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Phoenix, AZ 85007

White Claw Factory
New Construction - 916,000 SF
Construction
$250,000,000 est. value
Glendale, AZ 85340

Watkins Cultivation - Phase II
New Construction - 35,035 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Phoenix, AZ 85007

TSMC Inc
New Construction - 2,000,000 SF
Construction
$12,000,000 est. value
Phoenix, AZ 85085

Cider Corps
Build-Out - 14,000 SF
Design
Gilbert, AZ 85296

TV Cultivation Facility
Renovation - 88,268 SF
Construction
$3,229,927 est. value
Phoenix, AZ 85009

KORE Power Manufacturing Plant
New Construction - 1,000,000 SF
Design
$500,000,000 est. value
Buckeye, AZ

Reported 03/04/2022 12:22 PM
Project Title

Edwards Semiconductor Manufacturing Facility

Physical Address View project details and contacts
City, State (County) Chandler, AZ 85286   (Maricopa County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New 200,000-square-foot semiconductor manufacturing facility. The Chandler facility will also feature warehousing facilities, factory areas, meeting rooms and a dedicated training center.

Details

Manufacturing/Processing Plant, 200,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents