Similar Projects
Last Updated | 07/08/2022 07:42 AM |
Project Title | UKGS MOB Urology Renovation |
Physical Address | View project details and contacts |
City, State (County) | Lexington, KY 40508 (Fayette County) |
Category(s) | Education, Medical |
Sub-Category(s) | College/University, Hospital |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Renovations of the 3rd floor urology suite at UKGS MOB. Mainly finishes with some minor HVAC, MEP scopes Renovation of 3rd floor suites 303 & 385, including interior wall and floor finish replacement, new acoustical panel ceiling grid and tile in specific areas, new casework and repair to existing casework, modifications to plumbing, mechanical and electrical and other Work indicated in the Contract Documents in order to provide a complete, working system(s), including, but not limited to the following a. Configuration and installation of all necessary temporary barriers and infection and dust control measures as required. Coordinate with Owner as to the final layout and configuration. b. Demolition and renovation of existing service areas. c. Installation of new walls, doors, ceilings and finishes. d. Alteration and renovation of the existing HVAC system as required for new work per the Mechanical Drawings, including demolition and alteration of existing ductwork, grilles and diffusers, exhaust systems, filters, etc. and the installation of new mechanical items as required by the Contract Documents. The Contractor shall test and balance the rooms in conjunction with the new HVAC system. e. Installation of new exhaust ductwork. f. Alteration and renovation of the existing electrical system as required for new work per the Electrical Drawings, including demolition and moving of existing conduits, wiring and outlets, lighting, etc. and the installation of new electrical items as required by the Contract Documents. g. The Contractor will provide a design-delegated design for the alteration and reconfiguration of the existing sprinkler system to be compliant with all applicable Authorities Having Jurisdiction. h. The Contractor will provide a design-delegated design for the seismic structural supports per Seismic Design Category C to be compliant with all applicable Authorities Having Jurisdiction. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | College/University, Renovation, Hospital, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |