Last Updated | 11/29/2022 08:34 AM |
Project Title | CM Columbine Hall Office AHU and RA Replacement |
Physical Address | View project details and contacts |
City, State (County) | Colorado Springs, CO 80918 (El Paso County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $479,020 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Columbine Hall was constructed in 1997 and is the most heavily used academic building on campus. The building includes two built up penthouse air handlers, with AHU-1 serving the classroom wing and AHU-2 serving the office wing. Each unit consists of a supply fan, return fans, hydronic heating coil, built up DX cooling coil with evaporative condensing unit and controls. Return Air System Replacement: The return fans for AHU-2 were installed in a relief fan configuration that requires the building to be pressurized to return air to the penthouse unit. The ceiling plenums in both wings were compartmentalized into return air (RA) zones. Transfer ducts were installed to move RA from each zone back to the main RA shaft that allowed RA to move up to the penthouse unit. During the original construction, some RA zones were not provided before reaching the RA shaft and most transfer ducts were sized too small. AHU Refurbishment: The CM project consists of replacing the R22 DX cooling coils, evaporative condensing unit, R22 compressors and associated piping and components from the penthouse air handing unit with a R438A DX cooling system. The project requires engineering services to evaluate and design modifications to the RA system and refurbishment of the AHU. Reactive maintenance is being practiced in order to bridge the gap before replacement can occur. UCCS, will provide Preliminary Design Documents and design intent. These documents are not to used as Construction Documents, it is the D/B Teams responsibility to provide all required Contract Documents per the Agreement and General Conditions. Email Questions Due, September 22, 2022 by 4 pm Email questions to Catherine Robbins at submit@uccs.edu Answers will be posted here by September 30, 2022 Contract Approval (projected): November 18, 2022 Anticipated General Contractor Start: December 15, 2022 Anticipated Construction Finish: December 15, 2023 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |