Similar Projects
South East Apron/Taxiway Phase I Construction - City of Ontario
Infrastructure
Conception
$750,000 CJ est. value
Ontario, OR 97914

North Oregon Street Development - City of Ontario
Infrastructure
Conception
$1,400,000 CJ est. value
Ontario, OR 97914

SE 5th St - East Lane Sidewalks (Ontario)
Infrastructure
Design
$1,007,504 CJ est. value
Ontario, OR 97914

Southeast 2nd Street Water and Sewer Improvements
Infrastructure
Post-Bid
$150,000 CJ est. value
Ontario, OR 97914

Southeast 2nd Street Water and Sewer Improvements
Infrastructure
Post-Bid
$150,000 CJ est. value
Ontario, OR 97914

Reload Facility Water Improvements
Infrastructure
Results
$200,000 est. value
Nyssa, OR

Wastewater Treatment Facility Headworks Improvements - 2022
New Construction, Infrastructure
Results
$990,150 CJ est. value
Vale, OR 97918

Grassy Mountain Gold Mining Project / Malheur County
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Harper, OR 97906

Boardman to Hemingway Transmission Line B2H
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Ontario, OR 97914

North Park Boulevard Extension - City of Ontario
Infrastructure
Conception
$1,300,000 CJ est. value
Ontario, OR 97914

Treasure Valley Reload Center - Contract 4 - Aggregate Roadways
Infrastructure
Post-Bid
$700,000 CJ est. value
Nyssa, OR 97913

Treasure Valley Reload Center - 2023 - Contract 5 - Foundations/Floor Slabs and Pre-engineered Steel Building Erection
New Construction, Infrastructure
Results
$3,196,078 CJ est. value
Ontario, OR 97914

East Idaho Underpass/Intersection - City of Ontario
Infrastructure
Conception
$300,000 CJ est. value
Ontario, OR 97914

Last Updated 06/21/2023 12:11 PM
Project Title

New Water Treatment Plant Improvements 2023

Physical Address View project details and contacts
City, State (County) Ontario, OR 97914   (Malheur County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $346,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of improving the Ontario Water Treatment Plant (WTP) by adding a new pre-engineered package water treatment plant (3rd Trident train), installing associated pipe connections, providing miscellaneous metal fabrications, performing miscellaneous building modifications to facilitate installation of the new treatment unit, addition of a new chemical feed pump, addition of a new louver, relocation of an overhead gas heater, modifications/extension to an overhead monorail system, installation of a new below ground concrete vault for new valves/flowmeter, associated yard piping work and connections to existing utilities, along with associated process instrumentation and electrical work. SCADA integration required by this project shall be furnished by the Owner. The Contractor shall be responsible to schedule and coordinate the SCADA integration with the Owner for system startup and inspection. The proposed pre-engineered water treatment unit and miscellaneous control valves and appurtenances have been pre-purchased by the Owner. The pre-purchase package shall be delivered to a location owned by the City of Ontario. The Contractor shall include provisions to receive such package, transport it within the construction site if necessary, and install the unit and associated work per contract documents. Any materials and services not covered/included by the pre-purchased package, shall be the responsibility of the Contractor to provide, furnish and install. The existing WTP has two (2) pre-existing Trident Units (pre-engineered water treatment plants) already in service that are to remain in service during the course of this project. Engineering Contact name/phone and e-mail: Marios Georgiou, 828-280-3123 or Joe Foote, joe.foote@consoreng.com, 509-321-0340. For information concerning the proposed Work, please contact : Engineering: Joe Foote, joe.foote@consoreng.com, (208) 947-9033, or Marios Georgiou, marios.georgiou@consoreng.com, (828) 280-3123. Owner's Representative: Al Haun, Al.Haun@jacobs.com, (541) 889-8572. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by the office issuing documents as having received the Bidding Documents. Questions received less than 7 days prior to the date for opening of Bids may not be answered. June 14, 2023 @ 5:00 PM – Bidder Questions received after this deadline may not be answered (ITB, Part 1.9).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents