Reported | 06/13/2020 12:00 AM |
Project Title | Kids Creek 14th Street Storm Drain Project |
Physical Address | View project details and contacts |
City, State (County) | Traverse City, MI (Grand Traverse County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Consultant |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work includes, but is not necessarily limited to, the following items. 1. Mobilization. 2. Acquire soil erosion and control permit, and any other permits required for the project. 3. Traffic control - including pedestrian and vehicular, as necessary. 4. Development and implementation of a Work Plan. 5. Development and implementation of the following Technical Work Plans: • Health and Safety Plan • Soil Erosion and Sedimentation Control Plan • Traffic Control Plan • Access and Staging Area Plan • Dewatering and Flow Diversion Plan 6. Establish and maintain vertical and horizontal controls and construction staking to control lines and grades. 7. Establish temporary construction access and staging areas. 8. Soil Erosion and Sediment Control. 9. Protection of existing structures. 10. Dewatering and temporary flow diversion. 11. Clearing and grubbing. 12. Removal and clearing of existing trees. 13. Excavation, final grading and spoil relocation. 14. Culvert and sheet pile installation. 15. Backfill, stone and riprap installation. 16. Weir installation. 17. Seeding and vegetation installation. 18. Site restoration. 19. Provide as-built of installed work. 20. Maintenance. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |