Similar Projects
West Winds Condominium (Stony Brook Phase III)
New Construction, Infrastructure
Design
$51,000,000 est. value
Fenton, MI 48430

Wyndemere Rehabilitation
Infrastructure
Bidding
$300,000 est. value
Flint, MI

2022 Micro-Surface - Proposal M-1 (MS0005, MS0006, MS0007, MS0008)
Infrastructure
Bidding
$800,000 est. value
Flint, MI

Paving & Site Lighting
Post-Bid

Mason Elementary Asphalt Paving Program
Post-Bid
Grand Blanc, MI 48439

0.22 MI of Road Grade Correction including Hot Mix Asphalt Resurfacing, Drainage, Culvert, Sewer and Pavement Markings
Results
MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 HMA Resurfacing Proposal B-1
Infrastructure
Bidding
$400,000 est. value
Flint, MI

GISD 2021 Pavement Improvements
Post-Bid
Less than $718,000 est. value
Flint, MI

19.56 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Full Depth Concrete Pavement Repairs, Joint Repairs and Pavement Markings
Results

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Overband Crack Sealing/ Seal Coating 2021
Results
Farmington, Fenton, Fowlerville, Howell, Milford, Wixom, MI

Resurfacing the Academy`s Entry Road to its Main Parking Lot
Infrastructure
Post-Bid
Flint, MI

2.19 Mi of Road Reconstruction, Storm Sewer and freeway Lighting Replacement
Results
Flint, MI

Asphalt Removal and Replacement
Term Contract
Post-Bid
Flint, MI 48505

Last Updated 07/06/2022 11:09 PM
Project Title

Davison Cardinal Center Paving Replacement

Physical Address View project details and contacts
City, State (County) Davison, MI 48423   (Genesee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Davison Community Schools for the replacement of the Asphalt Paving at the Cardinal Center (Admin Bldg.). Construction Timeline - This work will commence June 20th, 2022, and all work will have to be completed by August 12th, 2022. Work will include (but not limited to) the following: Soil Erosion, Selective Demolition, Storm Sewer, Removal and Replacement of Fencing, Concrete, Asphalt Paving, Parking Lot Markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents