Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

Eastrail Trail Connection at Spring Boulevard - City of Bellevue
Infrastructure
Design
$7,500,000 CJ est. value
Bellevue, WA 98005

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

West Valley Highway (Strander Boulevard to I-405)
Infrastructure
Post-Bid
$3,400,000 to $4,000,000 est. value
Tukwila, WA

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Sand Point Way NE Mixed Use Building
New Construction, Infrastructure - 61,316 SF
Pending Verification
$22,600,000 CJ est. value
Seattle, WA 98105

Sand Point Way NE Mixed Use Building
New Construction, Infrastructure - 61,316 SF
Pending Verification
$22,600,000 CJ est. value
Seattle, WA 98105

Crack and Joint Seal Work Order Contract
Renovation
Design
$1,000,000 est. value
WA

Lake Washington Ship Canal Water Line Replacement
Infrastructure
Bidding
$250,000 CJ est. value
Seattle, WA 98107

Sidewalks Package
Infrastructure
Post-Bid
Seattle, WA

Lake City Land Banked Site Park
Demolition, Infrastructure, Alteration
Results
Seattle, WA 98125

14th Avenue Residential Development
New Construction, Demolition, Alteration
Pending Verification
$1,000,000 est. value
Seattle, WA 98117

Last Updated 08/04/2022 04:15 PM
Project Title

Unit Price Transit Spot and Pedestrian Improvements Contract 1

Physical Address View project details and contacts
City, State (County) Seattle, WA 98164   (King County)
Category(s) Heavy and Highway, Sewer and Water, Transportation
Sub-Category(s) Maintenance, Misc. Structures, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,171,415 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

** This project has been awarded to Contract to KC Equipment LLC in the amount of $1,171,415. ** PROJECT LOCATION: Project locations will be throughout the City of Seattle as specified in each Work Package issued after the Contract is executed PROJECT DESCRIPTION: Perform improvements to transit access areas, including new bus shelter pads and foundations with electrical work, associated sidewalk and curb ramps. Typical work may include traffic control, survey, surface removal, sawcutting, excavation, subgrade preparation, forming, placing and finishing concrete work and coordinating with King County Metro for the installation of bus shelters, drainage, HMA and concrete roadway paving, stern wall and landscaping. CONTRACT DURATION: The Contract duration is for a period of 1 year with the option to extend to a 2nd year starting from the date of the first NTP issued against the first Work Package or until the date that the total payment requested meets the Not to Exceed award amount, whichever is earlier. PRE-BID SITE INSPECTION/MEETING: There is no pre-bid site inspection meeting scheduled for this project. 19 Percent WMBE utilization rates based on completed projects. For questions on the 1 nclusion Plan please contact Miguel Beltran at Miguel.beltran@seattle. gov or 206-684-4525. Back-up contact is Carmen Kucinski at carmen. kucinskiffi.seattle.gov or 206- 684-0188. QUESTIONS: Questions must be emailed by 5:00pm. 3 Business Days before Bid opening.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents