Similar Projects
RCB Culvert new - Triple Box - 720th Street
Infrastructure
Bidding
$750,000 CJ est. value
Cumberland, IA 50843

RCB Culvert new - Triple Box - 720th Street
Infrastructure
Bidding
$750,000 CJ est. value
Cumberland, IA 50843

2022 Storm Sewer Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Griswold, IA 51535

2022 Storm Sewer Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Griswold, IA 51535

Pipe Culverts - IOWA 92
Infrastructure
Results
IA

Corrugated Metal Pipe and Hardware
Infrastructure
Results
Atlantic, IA 50022

RCB Culvert new - Twin Box - 700th Street
Infrastructure
Bidding
$500,000 CJ est. value
Cumberland, IA 50843

8.71-acre Noble Initiative Residential Development
Renovation
Post-Bid
$1,223,000 CJ est. value
Griswold, IA 51535

Dual Wall Corrugated Plastic Pipe and Perforated Tile
Infrastructure
Results
Atlantic, IA 50022

SWIPCO Main Office Addition / Remodel
Addition, Demolition, Build-out, Infrastructure
Results
$927,000 CJ est. value
Atlantic, IA 50022

Wiota Facade Improvements
Renovation
Results
$320,000 CJ est. value
Wiota, IA 50274

PPCB Repair - I-80
Infrastructure
Results
$75,330 CJ est. value
Cumberland, IA 50843

RCB Culvert New - Twin Box - 710th St
Infrastructure
Results
$500,000 CJ est. value
Wiota, IA 50274

Revetment - Multiple location
Infrastructure
Results
$284,243 CJ est. value
Cumberland, IA 50843

Last Updated 08/17/2023 08:21 AM
Project Title

Cass County Sanitary Landfill Final Closure and Transfer Station Grading

Physical Address View project details and contacts
City, State (County) Atlantic, IA 50022   (Cass County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Buildings, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project consists generally of the construction of closure cap and passive gas venting system for Cells 0, 1, 2, and 2A (approximately 6.5 acres); general Transfer Station grading improvements; Topsoil Stripping; Groundwater Underdrain System; Waste Relocation; Passive Gas Venting System; General Fill; Compacted Clay Fill; Flexible Membrane Liner (FML); Culvert extension; High Density Polyethylene (HDPE) Piping (Leachate and Groundwater); Aggregate (washed sand and river gravel); Geocomposite; Silt fence; Seeding, Mulching, and Fertilizing; and other miscellaneous work. The bid security must be a minimum amount of 5% of the total project cost. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a Contract for the work bid upon and will furnish within 10 days after the award of Contract a corporate surety bond, on the form in the Project Manual, for the faithful performance of the Contract, in an amount equal to 100% of the amount of the Contract. The bidder's security shall be in the form of a cashier's check or a certified check drawn on an FDIC-insured bank in Iowa or on an FDIC-insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the Project Manual with corporate surety satisfactory to the OWNER. The bid shall contain no condition except as provided in the Project Manual. Work on the improvement shall commence in the summer of 2023 upon award by the OWNER. The OWNER requires the project to be substantially complete, including seeding, by October 31, 2023. If the work is not substantially complete in the time frames above, liquidated damages of Seven-Hundred Fifty and 00/100 dollars ($750.00) per calendar day will be assessed. Further, if the project is not complete within 30 days after substantial completion, liquidated damages of Two-Hundred Fifty and 00/100 dollars ($250.00) per calendar day will be assessed. The liquidated damages amount has been calculated as a percentage of the additional engineering costs, administrative costs, legal fees, revenue losses, or regulatory fines that the OWNER may incur as a result of exceeding the completion deadline. This project has commenced construction.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Erosion and Sedimentation Controls, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents