Similar Projects
Summerville Senior Housing
New Construction
Conception
SC 29485

The Reserve At Rock Hill
New Construction
Conception
Rock Hill, SC 29730

The Claibourne at Summerville
New Construction - 95,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Summerville, SC 29483

Whitehall Assisted Living
New Construction
Design
Indian Land, SC 29707

The Claiborne at Simpsonville
New Construction - 160,329 SF
Post-Bid
$50,000,000 est. value
Simpsonville, SC 29681

The Retreat At Seneca
New Construction - 146,500 SF
Post-Bid
$20,000,000 to $22,000,000 est. value
Seneca, SC

New Haven at Little River
New Construction
Construction
Little River, SC 29566

Retreat at Carolina Park
New Construction
Construction
Mount Pleasant, SC

Sora Wellness Assisted Living
New Construction - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bluffton, SC

Spring Street Health Center
New Construction - 14,233 SF
Design
$7,703,284 est. value
Charleston, SC 29403

Reunion at Congaree Pointe
New Construction
Construction
$16,000,000 est. value
Columbia, SC

Dorchester Senior Independent and Assisted Living
New Construction
Design
North Charleston, SC 29420

The Village At Summerville - Memory Care
New Construction - 9,980 SF
Construction
$6,000,000 to $8,000,000 est. value
Summerville, SC 29483

The Gables On Pelham
Renovation
Design
Greenville, SC 29615

Liberty Senior Care
New Construction - 87,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Charleston, SC

Reported 01/25/2022 03:36 PM
Project Title

Oaks at Aiken Assisted Living & Memory Care

Physical Address View project details and contacts
City, State (County) Aiken, SC 29801   (Aiken County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method General Contractor to Subcontract.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Assisted Living Facility, 2 Stories Above Grade, Approximately 60,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents