Similar Projects
Nevada Pacific Parkway Extension
New Construction, Infrastructure
Conception
$54,000,000 est. value
Fernley, NV 89408

Grand Estates Phase II
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Yerington, NV 89447

The Traditions Phase 3
New Construction, Infrastructure
Design
$23,000,000 CJ est. value
Yerington, NV 89447

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

PMP Maintenance Project
Infrastructure
Post-Bid
Fernley, NV

SR 338 - Slurry Seal
Infrastructure
Results
$515,000 to $620,000 est. value
NV

2022 County Roadway Resurfacing
Infrastructure
Results
$1,800,000 est. value
Dayton, NV

Holiday Inn / Fernley
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Fernley, NV 89408

Winston Solar Power
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yerington, NV 89447

Fernley High School Gymnasium, Dining Commons, and Kitchen Bid Package - Early Site Development
Infrastructure
Post-Bid
$6,900,000 est. value
Fernley, NV 89408

Villa Park Pavement, Sewer and Water Replacement
Infrastructure
Results
$2,852,000 CJ est. value
Fernley, NV 89403

Highway 95A Solar Power Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Yerington, NV 89447

Cottonwood Lane Drainage and Road Reconstruction Project
Infrastructure
Post-Bid
$3,500,000 CJ est. value
Fernley, NV 89408

Weed Heights Water Tanks Coatings Project
Renovation, Infrastructure
Results
$563,134 CJ est. value
Weed Heights, NV 89447

Last Updated 02/28/2023 09:03 AM
Project Title

Coldmill and Place Plantmix Bituminous Surface With Open Grade

Physical Address View project details and contacts
City, State (County) Silver Springs, NV 89429   (Lyon County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $16,500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Est. Value Notes: R31 ($13,500,000.01 to $16,500,000.00) This phased project consists of coldmill and plantmix bituminous surface with open grade in Mineral and Lyon Counties These improvements are taking place in Mineral County between milepost 0.00 and 10.679, and Lyon County between milepost 0.00 and 12.642. The road is classified as a minor arterial. US 95A within the project limits has one lane of traffic in each direction and a posted speed limit of 70 mph that steps down to 45 mph. Traffic control will consist of single lane closures which will be performed utilizing flaggers and a pilot car. This Transportation Management Plan (TMP) will describe the transportation management strategies developed throughout the course of this project. The strategies developed include the Maintenance of Traffic Plan and the Transportation Operations Plan. Pre-Qualification: Yes Coldmill and place plantmix bituminous surface with open grade *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents