Similar Projects
Cottages at College Acres Phase 4
New Construction, Infrastructure - 12,800 SF
Design
$1,000,000 CJ est. value
Wilmington, NC 28403

Grove Park
New Construction, Infrastructure
Design
$12,131,000 CJ est. value
Clemmons, NC 27012

NCSSM Western Campus
New Construction, Renovation - 1,016,000 SF
Post-Bid
Morganton, NC 28655

Wren Family Estates - Sitework
New Construction - 12,618 SF
Post-Bid
Siler City, NC 27344

Runway 23L Approach Clearing Project
Results
Greensboro, NC 27400

World-Wide Water Storage Tank Remediation
Term Contract
Results

Red Springs High School Athletic Complex
Construction
$3,000,000 to $4,000,000 est. value
Red Springs, NC 28377

Chair Road Waterline Extension
New Construction
Construction
$500,000 est. value
Castle Hayne, NC 28429

Kilmayne Place Senior Living
New Construction, Infrastructure - 86,000 SF
Pending Verification
$32,000,000 CJ est. value
Cary, NC 27511

Switchyard
New Construction, Infrastructure - 6,837 SF
Design
$1,800,000 CJ est. value
Wilmington, NC 28403

U-4437 Beryl Road Site Modifications
Infrastructure
Post-Bid
Raleigh, NC 27600

DPS - Rockingham Youth Development Center- Grading and Utilities
Results
Rockingham, NC 28379

The Shoppes of Madison Place
New Construction - 22,054 SF
Construction
$1,573,600 est. value
Charlotte, NC 28273

Hydro-Excavation Services
Infrastructure
Post-Bid
Charlotte, NC

Kannapolis Crossing Contract 3 - Elevated
Results
Kannapolis, NC

Last Updated 10/25/2022 03:14 PM
Project Title

Elevated Water Storage Tank - Town of Siler City

Physical Address View project details and contacts
City, State (County) Siler City, NC 27344   (Chatham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed plans to build a 500,000-gallon elevated water storage tank to supply water and fire flow for Wolfspeed. As of October 25, 2022, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to October 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents