Similar Projects
Villago Roof Recoating
Term Contract
Results
Casa Grande, AZ 85122

Casa Grande Middle School Auditorium Roof Replacement
Results
Casa Grande, AZ 85122

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Repair, Restore, Replacement of the Roof at Toltec Elementary School
Results
Less than $280,000 est. value
Eloy, AZ 85131

Roof Restoration of Gym at Casa Grande Union High School
Results
$30,000 to $50,000 est. value
Casa Grande, AZ 85122

Roofing Project at Picacho Elementary School
Post-Bid
Picacho, AZ 85141

Roofing Project at Kennedy Elementary School
Results
Superior, AZ 85173

Roof Restoration Project at Ranch Elementary School
Results
San Tan Valley, AZ 85140

Roof Restoration Project at Combs Traditional Academy
Results
San Tan Valley, AZ 85140

Roof Restoration Project at Ellsworth Elementary School
Results
San Tan Valley, AZ 85140

Roof Restoration Project at Combs High School
Results
San Tan Valley, AZ 85140

Roofing Repair and Maintenance
Post-Bid

Standing Seam Metal Roof On Artisan Village Buildings and Ramada
Post-Bid
Coolidge, AZ 85128

Palo Verde Elementary School Roof Restoration
Bidding
Casa Grande, AZ 85122

Last Updated 11/20/2020 05:26 PM
Project Title

Roof Restoration Project at Combs Middle School

Physical Address View project details and contacts
City, State (County) San Tan Valley, AZ 85140   (Pinal County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General Summary of Work: A- Cut and repair damage SPF roof areas if they occur. B - Clean all exterior surface of the roof. C - Repair, prepare and prime existing roofing surface for new roof. D - Regrade for positive drainage. E - Remove all building sealants on roo including those at all expansion joints and construction joints, sheet metal and flashing joints, penetrations, vertical wall transitions and any other sealants where they occur. F - Clean and repair joints and cracks, apply new backer rod and sealant. G - Remove all parapet copings and associated cleats, and wood nailers. H - Install new metal parapet coping over self-adhered bituminous flashing. I - Provide new roof blocks and traffic surfaces.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents