Similar Projects
Junk and Trash Removal
Term Contract, Alteration
Bidding
Aurora, IL

(1.017-Mile) Smart Overlay and Drainage on US 20 (Grant Hwy) from McHenry County Line to I-90 (Jane Addams Memorial Tollway)
Infrastructure
Bidding
Hampshire, IL

Snow and Ice Removal Services
Post-Bid
Batavia, IL

Snow Removal
Post-Bid
Geneva, IL 60134

Fox River Trail Culvert Repair and Improvements
Results
Elgin, IL 60120

7th Avenue Creek Construction Phase 1
Results
Saint Charles, IL

Snow Removal and Ice Control
Post-Bid
Gilberts, IL 60136

Ellithorpe Road Culvert Replacement
Results
Burlington, IL 60140

Residential Refuse, Recycling and Yard Waste Collection Program
Post-Bid
North Aurora, IL

Improvement Consists of a Culvert Repair of the Structure (SN 045-0299)
Results
IL

DHS Elgin MHC Garbage Removal Services
Post-Bid
Elgin, IL

2021 HMS Culvert Replacement - Bid Release 4
Results
Hampshire, IL 60140

Hauling Services
Term Contract
Post-Bid
Saint Charles, IL

Culvert Removal and Replacement
Results
Kaneville, IL 60144

Containers and Refuse/Recycling Service
Post-Bid
Burlington, IL

Reported 02/09/2022 04:12 AM
Project Title

Mastodon Lake Dredging and Shoreline Restoration

Physical Address View project details and contacts
City, State (County) Aurora, IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling, Shoreline/Erosion/Drainage
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Dredging and improvement of facilities in and along Mastodon Lake within the City of Aurora, Kane County, Illinois. The project location is accessible from HA Wyeth Drive, Pleasant Place and from Ashland Avenue. Dredged materials will be permanently stockpiled in the vicinity of Phillips Park. Dredging of the accumulated sediment from Mastodon Lake using hydraulic dredging methods, dewatering and hauling of dredged materials, installation of mechanical mixing and aeration devices, shoreline restoration using stone and bio-engineered techniques, installation of culvert pipes, as well as other miscellaneous appurtenances.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents