Similar Projects
Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,114,000 est. value
Harrold, SD

Install Cured in Place Pipe Lining in Condenser Water Piping
Term Contract
Design
Pierre, SD 57501

Sd63 - Fm The Us212 E Jct To N Of The Moreau River
Alteration
Design
$5,079,000 est. value
Trail City, SD 57657

Utility Extension Project North Military Road
Infrastructure
Bidding
$1,038,452 est. value
North Sioux City, SD 57049

Brookings Municipal Utilities Raw and Treated Water Pipeline
Infrastructure
Bidding
$9,300,000 to $11,000,000 est. value
Brookings, SD

2021 Water Main Replacement Installation
Post-Bid
Wessington Springs, SD 57382

Streeter Drive Realignment
Post-Bid
$1,281,000 est. value
North Sioux City, SD

East Watertown Street Water Main Replacement
Results
Rapid City, SD 57701

10th Avenue North Reconstruction
Results
$1,500,000 to $2,500,000 est. value
Watertown, SD 57201

US212 - Fm Dupree through Eagle Butte
Infrastructure
Design
$7,274,000 est. value
La Plant, SD 57652

Phase III Infrastructure Improvements
Infrastructure
Bidding
$3,800,000 est. value
Canistota, SD

Avon Main Street Reconstruction
Post-Bid
Less than $1,500,000 est. value
Avon, SD

2021 Watermain and Sewer Pipe, Fittings and Accessories, Manhole Covers, Inlet Frames and Grates
Results
$100,000 est. value
Aberdeen, SD

Contractor - Crow Creek Scattered Water and Sewer
Infrastructure
Design
$250,000 to $500,000 est. value
Fort Thompson, SD

Last Updated 07/21/2022 09:17 AM
Project Title

Treated Water Pipeline - Madison Service Line 3B/4

Physical Address View project details and contacts
City, State (County) Tea, SD   (Lincoln County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $14,000,000 to $18,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 81,213 linear feet of 16-inch diameter buried PVC or ductile iron pipe. Additionally, approximately 4,360 linear feet of pipe will be installed using horizontal directional drilling techniques. Approximately 790 linear feet of jacked or bored highway and railroad crossing casing pipe (24" diameter) and approximately 120 linear feet of open-cut casing pipe (24" diameter). Relocation and replacement of existing small diameter rural water lines and drain tile. Miscellaneous appurtenances including direct bury gate valves, manual air release valves, and blow-off assemblies. Corrosion protection system components including ground beds, rectifiers, galvanic anodes, and test stations. Components depend on type of pipe. Temporary and permanent erosion control, fencing, reclamation and seeding. Traffic control during construction. Pipeline pigging, flushing, hydrostatic pressure testing, and disinfection. And, Clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents