Similar Projects
Rhode Island State House Leaks Remediation Phase 2
Results
Providence, RI 02903

On-Call Masonry Repair Service
Alteration
Results
RI

Toilet and Sink Replacement
Alteration
Results
Woonsocket, RI

Field`s Point Roofing and Masonry Repairs
Results
Providence, RI

Masonry Restoration Services
Alteration
Post-Bid
Kingston, RI

Demountable Walls
Alteration
Results
$25,000 est. value
Bristol, RI

Construction - Sound Control Improvements
Results
Newport, RI

Westerly Senior Center Woodshop Ceiling Replacement
Alteration
Results
Westerly, RI 02891

Masonry Repair at Lippitt Elementary School
Alteration
Post-Bid
Warwick, RI

Exterior Masonry Restoration at Harbor View Manor
Alteration
Post-Bid
East Providence, RI 02915

Edward King House - Roof Replacement and Chimney Repairs -CDBG
Results
Newport, RI 02840

Scalabrini Piazza Lighting and Masonry Improvements
Alteration
Bidding
Providence, RI

4th Floor Sheetrock Replacement
Alteration
Post-Bid
Providence, RI

Tile Wall Refinishing at Cumberland High School
Alteration
Results
Cumberland, RI 02864

Bucklin Point Roofing and Masonry Repairs
Post-Bid
Providence, RI

Reported 01/13/2022 12:00 AM
Project Title

Masonry and Interior Wall Construction - Rainone Gym

Physical Address View project details and contacts
City, State (County) Johnston, RI 02919   (Providence County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior, Masonry
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all necessary labor, material and equipment to complete the masonry construction and interior wall construction as shown in architectural drawings This includes but is not limited to the following: Provide layout of walls prior to work start to allow for plumbing rough. Provide pipe penetrations in masonry as needed for plumbing and electrical work. Furnish/install all lintels as needed. Masonry finish should be clean and joints smooth and ready for paint. Extend masonry min. 1' above the highest abutting finish ceiling height. Clean off/scrape the interior concrete surface of the lower portion of the long, south wall (parallel to Mill St.) to a durable, consistent, and smooth finish that is suitable for gym patronage. Concrete finish/seal said wall thereafter for sustainability and interior aesthetics (any applicable color to be determined).

Details

Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents