Similar Projects
Pre-Event Emergency Roadside Assistance Services
Bidding

Pre-Event Emergency Roadside Assistance Services
Bidding

2020 CDBG Road Resurfacing Project Clough Avenue and Sherry Lane
Post-Bid
Lake Helen, FL 32744

Elkcam Boulevard Paved Shoulders - Segment 1
Post-Bid
Less than $1,178,301 est. value
Deltona, FL 32725

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Turtlemound Road Roadside Repair
Results
Less than $112,390 est. value
New Smyrna Beach, FL 32169

Longleaf Pine Preserve Trail Road Improvements
Bidding
$157,000 est. value
FL

Roadway Repair
Results
Less than $350,000 est. value
FL

Countywide Resurfacing 2021
Bidding
Less than $5,600,000 est. value
FL

10th Street Widening
Results
Less than $9,500,000 est. value
De Land, FL 32720

Asphaltic Concrete and Removal of Surfaces by Milling
Term Contract
Results
De Land, FL 32720

Citywide Paving Program
Results
Less than $800,000 est. value
Port Orange, FL 32129

Howland Boulevard Widening
Results
Less than $14,000,000 est. value
Deltona, FL

Concrete Roadway Repair
Results
Less than $950,000 est. value
FL

Spring to Spring Trail - Deleon Springs
Results
Less than $1,040,000 est. value
FL

Last Updated 04/08/2020 08:14 AM
Project Title

Resurfacing

Physical Address View project details and contacts
City, State (County) FL   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,630,916
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of Milling & Resurfacing, Base Work, Shoulder Treatment, Drainage Improvements, Curb and Gutter, Traffic Signals, Lighting, Highway Signing, Guardrail, Landscaping, Sidewalk Improvements, Retaining Walls, and other incidental construction on SR 5/US 1 in Volusia County from South of Woodland Avenue to Flagler County Line. Section 0001 Roadway 0101- 1- Mobilization (43913615201) Ls 1.000 0102- 1- Maintenance Of Traffic (43913615201) Ls 1.000 0102- 14- Traffic Control Officer Hr 384.000 0102- 60- Work Zone Sign Ed 22,660.000 0102- 61- Business Sign Ea 4.000 0102- 71- 15 Temporary Barrier, f&i, Anchored Lf 589.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 79,270.000 0102- 74- 2 Channelizing Device, Type Iii, 6` Ed 10.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 630.000 0102- 78- Temporary Retroreflective Pavement Marker Ea 1,862.000 0102- 89- 1 Temporary Crash Cushion, Redirective Option Lo 2.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 628.000 0102-104- Temporary Signalization And Maintenance, Intersection Ed 2,100.000 0102-107- 1 Temporary Traffic Detection And Maintenance,Intersection Ed 2,100.000 0102-150- 1 Portable Regulatory, Sign Ed 1,200.000 0102-150- 2 Radar Speed Display Unit Ed 1,200.000 0104- 10- 3 Sediment Barrier Lf 9,885.000 0104- 18- Inlet Protection System Ea 141.000 0107- 1- Litter Removal Ac 519.690 0107- 2- Mowing Ac 364.970 0108- 1- Monitor Existing Structures- Inspection And Settlement Monitoring (43913615201) Ls 1.000 0108- 2- Monitor Existing Structures- Vibration Monitoring (43913615201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (43913615201) Ls 1.000 0110- 4- 10 Removal Of Existing Concrete Sy 682.000 0110- 7- 1 Mailbox, f&i Single Ea 7.000 0120- 1- Regular Excavation Cy 2,416.000 0120- 6- Embankment Cy 1,333.000 0125- 1- Excavation For Structures Cy 507.400 0160- 4- Type b Stabilization Sy 12,340.000 0285-701- Optional Base, Base Group 01 Sy 1,335.000 0285-709- Optional Base, Base Group 09 Sy 5,816.000 0327- 70- 1 Milling Exist Asph Pavt, 1" Avg Depth Sy 12,637.000 0327- 70- 11 Milling Exist Asph Pavt, 2 1/4" Avg Depth Sy 22,352.000 0327- 70- 13 Milling Exist Asph Pavt, 1 3/4" Avg Depth Sy 111,030.000 0327- 70- 19 Milling Exist Asph Pavt, 3/4" Avg Depth Sy 4,749.000 0334- 1- 13 Superpave Asphaltic Conc, Traffic c Tn 654.800 0334- 1- 53 Superpave Asphaltic Concrete, Traffic c, Pg76-22 Tn 13,645.400 0337- 7- 25 Asphalt Concrete Friction Course, Inc Bit, Fc-5, Pg 76-22 Tn 5,808.700 0339- 1- Miscellaneous Asphalt Pavement Tn 196.100 0400- 0- 11 Concrete Class Ns, Gravity Wall Cy 147.200 0400- 1- 2 Concrete Class i, Endwalls Cy 5.700 0425- 1-471 Inlets, Curb, Type 7, <10` Ea 1.000 0425- 1-521 Inlets, Dt Bot, Type c,<10` Ea 8.000 0425- 1-523 Inlets, Dt Bot, Type c,Jbot, <10` Ea 1.000 0425- 1-531 Inlets, Ditch Bottom, Type c Modified- Back Of Sidewalk, <10` Ea 1.000 0425- 1-551 Inlets, Dt Bot, Type e, <10` Ea 1.000 0425- 1-701 Inlets, Gutter, Type s, <10` Ea 3.000 0425- 1-705 Inlets, Gutter, Type s, Partial Ea 1.000 0425- 2- 41 Manholes, p-7, <10` Ea 1.000 0425- 2- 61 Manholes, p-8, <10` Ea 1.000 0425- 2- 63 Manholes, p-8, Partial Ea 3.000 0425- 2- 91 Manholes, j-8, <10` Ea 1.000 0425- 11- Modify Existing Drainage Structure Ea 3.000 0425- 82- Replace Grate Ea 1.000 0430-175-118 Pipe Culvert,Optional Material,Round, 18"s/Cd Lf 1,007.000 0430-175-124 Pipe Culvert,Optional Material,Round, 24"s/Cd Lf 127.000 0430-175-136 Pipe Culvert, Opt Material, Round, 36"s/Cd Lf 24.000 0430-175-218 Pipe Culvert,Optional Material,Other-Elip/Arch, 18"s/Cd Lf 60.000 0430-175-224 Pipe Culvert,Optional Material,Other Shape-Elip/Arch, 24"s/Cd Lf 702.000 0430-984-125 Mitered End Section, Optional Round, 18" Sd Ea 1.000 0430-984-129 Mitered End Section, Optional Round, 24" Sd Ea 1.000 0430-984-629 Mitered End Sect, Optional - Elliptical / Arch, 24" Sd Ea 1.000 0515- 1- 1 Pipe Handrail - Guiderail, Steel Lf 198.000 0520- 1- 7 Concrete Curb & Gutter, Type e Lf 371.000 0520- 1- 10 Concrete Curb & Gutter, Type f Lf 286.000 0520- 6- Shoulder Gutter- Concrete Lf 542.000 0520- 70- Concrete Traffic Separator, Special- Variable Width Sy 127.000 0521- 72- 56 Shoulder Concrete Barrier, 56" Pier Protection Barrier/Crash Wall Lf 425.000 0522- 1- Concrete Sidewalk And Driveways, 4" Thick Sy 895.000 0522- 2- Concrete Sidewalk And Driveways, 6" Thick Sy 600.000 0524- 2- 2 Concrete Slope Pavement,Non Reinforced, 4" Sy 179.000 0527- 2- Detectable Warnings Sf 583.000 0536- 1- 1 Guardrail -Roadway, General Tl-3 Lf 2,777.000 0536- 1- 3 Guardrail- Roadway, Double Face Lf 288.000 0536- 7- 3 Special Guardrail Post- Encased Post For Shallow Mount Ea 14.000 0536- 8- 13 Approach Transition Connection To Rigid Barrier, Furnish And Install, Tl-3 Ea 6.000 0536- 73- Guardrail Removal Lf 2,462.000 0536- 85- 20 Guardrail End Treatment- Trailing Anchorage Ea 5.000 0536- 85- 24 Guardrail End Treatment- Parallel Approach Terminal Ea 7.000 0544- 3- 1 Crash Cushion, Tl-3, Narrow Ea 2.000 0550- 10-220 Fencing, Type b, 5.1-6.0`, Standard Lf 268.000 0570- 1- 1 Performance Turf Sy 9,172.000 0570- 1- 2 Performance Turf, Sod Sy 19,861.000 0710- 11-101 Painted Pavement Markings, Standard, White, Solid, 6" Gm 14.890 0710- 11-102 Painted Pavement Markings, Standard, White, Solid For Interchange And Urban Island, 8" Gm 0.384 0710- 11-123 Painted Pavement Markings, Standard, White, Solid For Crosswalk And Roundabout, 12" Lf 3,705.000 0710- 11-125 Painted Pavement Markings, Standard, White, Solid For Stop Line Or Crosswalk, 24" Lf 4,683.000 0710- 11-131 Painted Pavement Markings, Standard, White, Skip, 10-30 Or 3-9 Skip, 6" Wide Gm 6.524 0710- 11-141 Painted Pavement Markings, Standard, White, 2-4 Dotted Guideline/ 6-10 Dotted Extension, 6" Gm 1.597 0710- 11-201 Painted Pavement Markings, Standard, Yellow, Solid, 6" Gm 5.970 0710- 11-241 Painted Pavement Markings, Standard, Yellow, 2-4 Dotted Guideline/6-10 Dotted Extension, 6" Gm 1.848 0999- 25- Initial Contingency Amount, Do Not Bid (43913615201) Ls 1.000 Section 0002 Signing 0523- 1- 3 Patterned Pavement, Vehicular Areas- Green Bike Lane Sy 106.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 95.000 0695- 1- 1 Traffic Monitoring Site Vehicle Sensor-Non-Weight, Furnish & Install Ea 4.000 0695- 6- 12 Traffic Monitoring Site Inductive Loop Assembly, Furnish & Install, 2 Loops Ea 4.000 0695- 7-132 Traffic Monitoring Site Cabinet, Furnish & Install, Type 3,Pedestal Mount Ea 2.000 0695- 7-600 Traffic Monitoring Site Cabinet, Remove Existing Cabinet Ea 4.000 0700- 1- 11 Single Post Sign, f&i Ground Mount, Up To 12 Sf As 123.000 0700- 1- 12 Single Post Sign, f&i Ground Mount, 12-20 Sf As 33.000 0700- 1- 13 Single Post Sign, f&i Ground Mount, 21-30 Sf As 12.000 0700- 1- 50 Single Post Sign, Relocate As 14.000 0700- 1- 60 Single Post Sign, Remove As 181.000 0700- 2- 14 Multi- Post Sign, f&i Ground Mount, 31-50 Sf As 10.000 0700- 2- 15 Multi- Post Sign, f&i Ground Mount, 51-100 Sf As 3.000 0700- 2- 60 Multi- Post Sign, Remove As 5.000 0700- 3-501 Sign Panel, Relocate, Up To 12 Sf Ea 37.000 0700- 3-601 Sign Panel, Remove, Up To 12 Sf Ea 2.000 0701- 18-101 Profiled Thermoplastic,Standard- Asphalt Surfaces, White, Solid,6" Gm 3.462 0701- 18-201 Profiled Thermoplastic,Standard- Asphalt Surfaces, Yellow, Solid,6" Gm 2.739 0705- 10- 1 Object Marker, Type 1 Ea 31.000 0705- 11- 3 Delineator, Flexible High Visability Median Ea 64.000 0710- 11-290 Painted Pavement Markings, Standard, Yellow, Islandnose Sf 148.000 0710- 90- Painted Pavement Markings, Final Surface (43913615201) Ls 1.000 0711- 11-123 Thermoplastic, Standard, White, Solid, 12" For Crosswalk And Roundabout Lf 3,705.000 0711- 11-124 Thermoplastic, Standard, White, Solid, 18" For Diagonals And Chevrons Lf 1,365.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" For Stop Line And Crosswalk Lf 1,098.000 0711- 11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10 Gap Extension, 6" Gm 1.663 0711- 11-160 Thermoplastic, Standard, White, Message Or Symbol Ea 6.000 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 162.000 0711- 11-224 Thermoplastic, Standard, Yellow, Solid, 18" For Diagonal Or Chevron Lf 572.000 0711- 11-241 Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6-10 Dotted Extension Line, 6" Gm 2.024 0711- 14-125 Thermoplastic, Preformed, White, Solid, 24" For Crosswalk Lf 3,608.000 0711- 14-160 Thermoplastic, Preformed, White, Message Ea 40.000 0711- 14-170 Thermoplastic, Preformed, White, Arrow Ea 40.000 0711- 15-101 Thermoplastic, Standard-Open Graded Asphalt Surfaces White, Solid, 6" Gm 5.669 0711- 15-102 Thermoplastic, Standard-Open Graded Asphalt Surfaces, White, Solid, 8" Gm 0.384 0711- 15-131 Thermoplastic, Standard-Open Graded Asphalt Surfaces, White, Skip, 6",10-30 Skip Or 3-9 Lane Drop Gm 6.172 0711- 15-201 Thermoplastic, Standard-Open Graded Asphalt Surfaces, Yellow, Solid, 6" Gm 3.057 0711- 17- 1 Thermoplastic, Remove Existing Thermoplastic Pavement Markings- Surface To Remain Sf 73.000 0713-103-101 Permanent Tape, White, Solid, 6" For Concrete Bridges Gm 0.078 0713-103-131 Permanent Tape, White, Skip/Dotted, 6" For Concrete Surfaces Gm 0.078 0713-103-201 Permanent Tape, Yellow, Solid, 6" For Concrete Bridges Gm 0.078 0713-103-331 Permanent Tape, Black, Skip/Dotted, 6" For Concrete Surfaces Gm 0.078 Section 0003 Lighting 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 652.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 927.000 0630- 2- 14 Conduit, Furnish & Install, Aboveground Lf 181.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 16.000 0635- 3- 12 Junction Box, Furnish & Install, Mounted Ea 6.000 0715- 1- 12 Lighting Conductors, f&i, Insulated, No.8 - 6 Lf 1,760.000 0715- 4- 12 Light Pole Complete, Furnish & Install Standard Pole Standard Foundation, 35` Mounting Height Ea 6.000 0715- 4- 14 Light Pole Complete, Furnish & Install Standard Pole Standard Foundation, 45` Mounting Height Ea 3.000 0715- 4- 70 Light Pole Complete, Remove Pole And Foundation Ea 2.000 0715- 5- 31 Luminaire & Bracket Arm- Aluminum, Furnish & Install New Luminaire And Arm On New/Existing Pole Ea 12.000 0715- 7- 11 Load Center, f&i, Secondary Voltage Ea 2.000 0715- 11-125 Luminaire, f&i, Under Deck, Wall Mount Ea 6.000 0715-500- 1 Pole Cable Distribution System, Furnish And Install, Conventional Ea 12.000 0715-500- 3 Pole Cable Distribution System, Wall Mount Ea 6.000 Section 0004 Signalization 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 2,550.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 4,955.000 0630- 2- 14 Conduit, Furnish & Install, Aboveground Lf 40.000 0632- 7- 1 Signal Cable- New Or Reconstructed Intersection, Furnish & Install Pi 6.000 0632- 7- 6 Signal Cable, Remove- Intersection Pi 6.000 0633- 1-121 Fiber Optic Cable, f&i, Underground,2-12 Fibers Lf 110.000 0633- 1-122 Fiber Optic Cable, f&i, Underground,13-48 Fibers Lf 70.000 0633- 1-123 Fiber Optic Cable, f&i, Underground,49-96 Fibers Lf 1,890.000 0633- 2- 31 Fiber Optic Connection, Install, Splice Ea 36.000 0633- 3- 11 Fiber Optic Connection Hardware, f&i, Splice Enclosure Ea 2.000 0633- 3- 12 Fiber Optic Connection Hardware, f&i, Splice Tray Ea 4.000 0633- 3- 13 Fiber Optic Connection Hardware, f&i, Preterminated Connector Assembly Ea 2.000 0633- 3- 15 Fiber Optic Connection Hardware, f&i, Preterminated Patch Panel Ea 6.000 0634- 4-151 Span Wire Assembly, f&i, Two Point, Perpendicular Pi 1.000 0634- 4-600 Span Wire Assembly, Remove- Poles Remain Pi 1.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 75.000 0635- 2- 12 Pull & Splice Box, f&i, 24" x 36" Cover Size Ea 3.000 0635- 2- 13 Pull & Splice Box, f&i, 30" x 60" Rectangular Or 36" Round Cover Size Ea 2.000 0639- 1-112 Electrical Power Service, f&i, Overhead Meter Purchased By Contractor From Power Company As 1.000 0639- 1-122 Electrical Power Service, f&i, Underground, Meter Purchased By Contractor As 5.000 0639- 1-610 Electrical Power Service, Remove Overhead As 3.000 0639- 2- 1 Electrical Service Wire, Furnish & Install Lf 985.000 0639- 3- 11 Electrical Service Disconnect, f&i, Pole Mount Ea 2.000 0641- 2- 12 Prestressed Concrete Pole, f&i, Type p-Ii Service Pole Ea 7.000 0641- 2- 60 Prestressed Concrete Pole, Complete Pole RemovalPedestal/Service Pole Ea 3.000 0641- 2- 70 Prestressed Concrete Pole, Shallow Pole Removal- Pole 30` And Greater Ea 4.000 0646- 1- 11 Aluminum Signals Pole, Pedestal Ea 26.000 0646- 1- 60 Aluminum Signals Pole, Remove Ea 6.000 0649- 21- 6 Steel Mast Arm Assembly, Furnish And Install, Single Arm 50` Ea 1.000 0649- 21- 15 Steel Mast Arm Assembly, Furnish And Install, Single Arm 70` Ea 1.000 0649- 21- 19 Steel Mast Arm Assembly, Furnish And Install, Double Arm 70`-60` Ea 1.000 0649- 21- 20 Steel Mast Arm Assembly, Furnish And Install, Double Arm 70`-70` Ea 1.000 0649- 21- 21 Steel Mast Arm Assembly, Furnish And Install, Single Arm 78` Ea 1.000 0650- 1- 14 Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 Way As 30.000 0650- 1- 16 Vehicular Traffic Signal, Furnish & Install Aluminum, 4 Section, 1 Way As 2.000 0650- 1- 60 Vehicular Traffic Signal, Remove- Poles To Remain As 12.000 0650- 1- 70 Vehicular Traffic Signal, Relocate- Includes Removal And Reinstallation As 2.000 0650- 2-102 Vehicular Signal Auxiliaries, Repair/Replace/RetrofitFurnish & Install, Backplate- Black With Reflect Border Ea 15.000 0653- 1- 11 Pedestrian Signal, Furnish & Install Led Countdown, 1 Way As 26.000 0653- 1- 60 Pedestrian Signal, Remove Ped Signal- Pole/Pedestal To Remain As 1.000 0660- 1-103 Loop Detector Inductive, f&i, Type 3 Ea 7.000 0660- 1-104 Loop Detector, Inductive, f&i, Type 4, 2channel, Solid State, Shelf Mounted, Time Delay Ea 1.000 0660- 2-102 Loop Assembly, f&i, Type b As 8.000 0660- 2-106 Loop Assembly, f&i, Type f As 4.000 0660- 4- 11 Vehicle Detection System- Video, Furnish & Install Cabinet Equipment Ea 5.000 0660- 4- 12 Vehicle Detection System- Video, Furnish & Install Above Ground Equipment Ea 17.000 0660- 4- 60 Vehicle Detection System- Video, Remove Ea 5.000 0663- 1-121 Signal Priority And Preemption System, Furnish And Install, Gps, Replace Cabinet Electronics Ea 6.000 0663- 1-122 Signal Priority And Preemption System, Furnish And Install, Gps, Detector Ea 6.000 0663- 1-600 Signal Priority & Preemption System, Remove Ea 2.000 0665- 1- 11 Pedestrian Detector, Furnish & Install, Standard Ea 18.000 0665- 1- 12 Pedestrian Detector, Furnish & Install, Accessible Ea 8.000 0665- 1- 60 Pedestrian Detector, Remove- Pole/Pedestal To Remain Ea 1.000 0670- 5-111 Traffic Controller Assembly, f&i, Nema, 1 Preemption As 6.000 0670- 5-600 Traffic Controller Assembly, Remove Controller With Cabinet As 6.000 0682- 1-113 Its Cctv Camera, f&i, Dome Ptz Enclosure - Pressurized, Ip, High Definition Ea 3.000 0682- 1-600 Its Cctv Camera,, Remove & Disposal Ea 1.000 0684- 1- 1 Managed Field Ethernet Switch, Furnish & Install Ea 2.000 0685- 1- 12 Uninterruptible Power Supply, Furnish And Install, Online/Double Conversion Ea 6.000 0700- 3-201 Sign Panel, Furnish & Install Overhead Mount, Up To 12 Sf Ea 4.000 0700- 5- 22 Internally Illuminated Sign, Furnish & Install, Overhead Mount, 12-18 Sf Ea 7.000 Section 0005 Landscape / Peripheral 0110- 2- 2 Selective Clearing And Grubbing, Areas With Trees To Remain Ac 0.050 0581- 1- 1 Relocate Trees And Palms, Palm, <14` Of Clear Trunk Ea 1.000 0581- 1- 3 Relocate Trees And Palms,Multi-Trunk Or Clustering Ea 20.000 0590- 70- 1 Irrigation System Repairs (43913615201) Ls 1.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 12 - Furnishings, Interior Planters and Artificial Plants, Interior Landscaping Accessories.
Division 26 - Electrical, Lighting.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Guideways/Railways, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents