Similar Projects
Chiller Replacement at Valley Horizon Elementary School
Term Contract
Results
Yuma, AZ 85364

Chiller Replacement at Centennial Middle School
Term Contract
Results
Yuma, AZ 85364

Kitchen Exhaust Hood Cleaning for ASPC Yuma
Term Contract
Results
Buckeye, Douglas, Florence, Globe, Goodyear, Phoenix, Safford, Saint Johns, San Luis, Tucson, Willcox, Winslow, Yuma, AZ 85349

Desert Mesa Chiller Plant Replacement
Results
Yuma, AZ 85365

Figueroa Waste Water Treatment Plant HVAC Replacement
Results
Yuma, AZ 85364

Fourth Avenue Junior High School Cooling Tower Replacement
Term Contract
Results
Yuma, AZ 85364

Cooling Tower Replacement at Valley Horizon Elementary School
Term Contract
Results
Yuma, AZ 85364

J041--Southern Arizona VA Healthcare System (SAVAHCS) Fisher House HVAC Control System Upgrade
Post-Bid
Tucson, AZ 85705

Air Conditioner Unit Preventive Maintenance Services
Term Contract
Post-Bid
Hayden, Payson, Phoenix, Prescott, Yuma, AZ

AC and Chiller Maintenance
Post-Bid
Coolidge, Oracle, San Carlos, AZ 85128

Comite-Las Casitas HVAC Replacement Project
Alteration
Post-Bid
San Luis, AZ 85349

Yuma County Library District San Luis Branch Rooftop AC Unit Replacement
Alteration
Results
San Luis, AZ 85349

Clean and Sanitize HVAC and Air Ducts
Term Contract
Post-Bid
Whiteriver, AZ 85941

SFB HVAC Replacement - Middle School Multipurpose Building
Term Contract, Alteration
Bidding
Roll, AZ 85347

SFB HVAC Replacement - Mohawk Valley School Main Building
Alteration
Bidding
Roll, AZ 85347

Reported 06/24/2021 12:00 AM
Project Title

Somerton Community Center HVAC Renovation

Physical Address View project details and contacts
City, State (County) Somerton, AZ   (Yuma County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project will require removing four existing evaporative coolers and replacing them with a new HVAC system to condition the existing gymnasium which is approximately 70’ x 100’. The new HVAC system consists of four new heat pump units and a fabric duct system. Existing ridge vents will be replaced and modified to accommodate new HVAC system. Electrical work will require modifications to the existing electrical distribution including replacement of SES to accommodate new mechanical units and future expansion, new electrical panel, and new receptacles. Modifications to the existing fire alarm system will be required to accommodate new duct smoke detectors. Site improvements will require removal and replacement of existing parking lot pavement to accommodate new electrical work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents