Similar Projects
South Kawishiwi Pavilion Ramp Construction and Log Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Ely, MN 55731

South Kawishiwi Pavilion Ramp Construction and Log Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Ely, MN 55731

Concrete Pavement Rehabilitation, Bituminous Surfacing
Results
MN

CSAH 2 Concrete Rehabilitation and ADA Improvements
Infrastructure, Alteration
Results
$848,117 est. value
MN

SPPS Jie Ming Mandarin Immersion Part 3 BP #3
Renovation
Construction
$3,000,000 CJ est. value
Saint Paul, MN 55116

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Earthwork, Utilities, Building Demolition
Infrastructure - 20,000 SF
Construction
$1,086,550 CJ est. value
Saint Paul, MN 55116

As-Needed Concrete and Masonry Services
Term Contract
Post-Bid
MN

2022 Random Concrete Repairs
Infrastructure, Alteration
Results
Saint Louis Park, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2022 Miscellaneous Concrete Work
Alteration
Results
Faribault, MN

Concrete Season Supply
Term Contract
Post-Bid
Rochester, MN

Silver Ramp Corrective Work
Alteration
Results
$3,291,435 est. value
Minneapolis, MN

Concrete Repair and Maintenance
Alteration
Post-Bid
MN

Basketball Court Replacement
Infrastructure, Alteration
Results
Lakeville, MN

11th and Marquette Post-Tension Tendon Repair
Infrastructure
Post-Bid
Minneapolis, MN

Last Updated 06/03/2023 07:02 AM
Project Title

2023 Street & Utility Improvement Project No. 1

Physical Address View project details and contacts
City, State (County) Fergus Falls, MN 56537   (Otter Tail County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $420,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of reconstructing approximately 2,430 LF of bituminous street which will include the removal and replacement of 2,100 LF of 8"-10" sanitary sewer main, 2,300 LF of 6" riser/lead pipe, 10 sanitary sewer manholes, 2,350 LF of 6" water main, 2,350 LF of 1" copper service pipe, reconstruction of 9,350 SY of roadway including 2,000 LF of curb and gutter replacement, 11,000SF of sidewalk/driveway apron replacement with ADA improvements, 3,250 CY Common Excavation, 3,000 Ton Aggregate Base Class 5, 2,400 Bituminous mix, 1,200 LF of 12"-18" RCP Storm Sewer, storm sewer structures and other miscellaneous items. Site Directions: Summit Avenue: Broadway To Oak Street Linden Street: Broadway To Oak Street Laurel Street: First Avenue To Broadway All Within City Limits.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents