Similar Projects
Blower Building 090 Blower - 23R04 - North Shore Water Reclamation District
Alteration
Conception
$1,409,400 est. value
Gurnee, IL

UV System Upgrade - Construction - 23R23 - North Shore Water Reclamation District
Alteration
Conception
$3,147,200 est. value
Gurnee, IL

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Asphalt Sealcoating and Repairs at Raw Water Pump Station, Elevated Tank and Booster Pump Station Facilities
Infrastructure
Design
$200,000 CJ est. value
Lake Bluff, IL 60044

Lake Bluff Pump Station (PS-6) Sewage Storage Basin
Renovation, Infrastructure
Bidding
$9,800,000 CJ est. value
Lake Bluff, IL 60044

Shepherd's Crook Putting Green and Short Game Expansion
Infrastructure
Bidding
$200,000 CJ est. value
Zion, IL 60099

2021 Water Distribution Pressure Sensors
Post-Bid
Lake Forest, IL 60045

Forest Cove Sanitary Lift Station Replacement
Post-Bid
Waukegan, IL

Waveland Avenue Water Main and Storm Sewer Improvements
Results
$400,000 est. value
Gurnee, IL

Water and Sewer Interconnect Phase 1
Results
Fox Lake, IL

The Clove
New Construction, Infrastructure - 113,000 SF
Construction
$150,000,000 CJ est. value
Buffalo Grove, IL 60089

Courtland Commons
New Construction, Infrastructure
Pending Verification
$1,487,300 CJ est. value
Mundelein, IL 60060

Heritage Woods Assisted Living
New Construction, Infrastructure - 123,723 SF
Pending Verification
$3,000,000 CJ est. value
Deerfield, IL 60015

PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
$5,368,000 CJ est. value
Gurnee, IL 60031

St. James Fitness and Recreation Development
Demolition, New Construction, Infrastructure - 435,488 SF
Design
$75,000,000 CJ est. value
Lincolnshire, IL 60069

Last Updated 10/12/2022 12:07 AM
Project Title

Utility Improvements - S Old Rand Road and Main Street

Physical Address View project details and contacts
City, State (County) Lake Zurich, IL 60047   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Water Transmission Pipelines, Water/Wastewater Infrastructure, Waterlines, Trenchless Utility Construction Description: The project work consists of the installation of 835 feet of 12" PVC C900 watermain, 40 feet of 10" SDR-26 Sanitary Sewer, and 110 feet of 12" Storm Sewer. Project Additive No. 1 (Phase 2 as noted on the plans) consists of the installation of 210 feet of 12" PVC C900 watermain, and auger and jack 100 feet of 20" steel casing. New valve vaults, sanitary manholes, storm structures, hydrants, and replacement of existing water services and buffalo boxes. Pavement patching on Main Street and S Old Rand Road will be required. Work will also include the restoration of areas disturbed during construction Project Inquiries 5:00 PM on Friday, April 29, 2022. If necessary, a final addendum will be issued by Tuesday, May 3, 2022, by 12:00 PM (Noon).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents