Similar Projects
Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations-D3
Renovation, Infrastructure
Bidding
$1,305,420 est. value
Worcester, MA

Reconstruction on Route 20, From Richardsons Corner Easterly to Route 12, Includes Rehab of C-06-023 and Replacement of 0-06-002
Renovation, Alteration
Bidding
$61,883,270 est. value
Charlton, MA 01507

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Brookfield Road Over Cady Brook Bridge
Post-Bid
$651,500 est. value
Charlton, MA

Bridge Rehabilitation - Elm Street Over Quick Stream Overflow
Results
$400,000 est. value
Blackstone, MA 01504

Scheduled and Emergency Drawbridge Operation, Maintenance and Repairs at Various Locations
Results
Less than $5,090,000 est. value

Scheduled and Emergency Bridge Structural and Substructure Repairs at Various Locations
Renovation, Infrastructure
Bidding
$1,436,470 est. value
Worcester, MA

Old Mill Road Over Bowers Brook Bridge Rehabilitation
Infrastructure
Post-Bid
$150,000 est. value
Harvard, MA

Scheduled and Emergency Drawbridge Operation, Maintenance and Repairs at Various Locations (including Martha's Vineyard)
Results
Less than $3,663,775 est. value

Bridge Superstructure Replacement and Related Work Bridge Number U-02-052 (Next D Beams), Route 146 Southbound Off-Ramp (Exit 2) Over Emerson Brook
New Construction, Infrastructure
Bidding
$1,342,330 est. value
Uxbridge, MA 01569

Roadway Reconstruction and Related Work
New Construction, Infrastructure
Post-Bid
$63,000,000 est. value
Charlton, MA

Scheduled and Emergency Bridge Superstructure Repairs and Related Work at Various Locations
Results
Less than $747,769 est. value

Leino Park Bridge Replacement
New Construction, Infrastructure
Post-Bid
Westminster, MA 01473

Scheduled and Emergency Bridge Substructure Repairs at Various Locations
Results
Less than $388,700 est. value

Bridge Rehabilitation BR No L-17-009 (Concrete) Massachusetts Avenue (Route 2A) Over Pearl Hill Brook
Results
Lunenburg, MA 01462

Last Updated 06/07/2022 05:02 AM
Project Title

Bridge Substructure Concrete Repairs and Related Work Bridge Number H-18-029 - Pier #2 NB and SB Interstate 190 Over the Quinapoxet River

Physical Address View project details and contacts
City, State (County) Holden, MA   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,244,170 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents