Similar Projects
Figueroa Ave WPCF Facility Improvements
Renovation
Conception
$61,500,000 est. value
Yuma, AZ 85364

WRF Expansion Construction
New Construction
Conception
$1,800,000 est. value
Casa Grande, AZ

RFQ D/B - Design-build Manager for Water Campus Administration Building Expansion and New Lab
Addition, Demolition, New Construction, Infrastructure
Design
$13,000,000 CJ est. value
Scottsdale, AZ 85251

Water Reclamation Facility #6 Phase 1
New Construction
Design
$12,000,000 est. value
Buckeye, AZ

RFQ Design - Signal Butte Water Treatment Plant Expansion (SBWTP)
Addition, Demolition, Renovation, Infrastructure
Bidding
$6,000,000 CJ est. value
Mesa, AZ 85212

RFQ Construction Manager at Risk - Cholla Water Treatment Plant 2023 Improvements
Renovation, Infrastructure
Bidding
$19,000,000 CJ est. value
Glendale, AZ 85304

Medium Coarse Headworks Bar Screen And Washer
New Construction
Post-Bid
Somerton, AZ

Signal Butte Water Treatment Plant Expansion
Addition
Post-Bid
$70,000,000 est. value
Mesa, AZ

Cattail Cove State Park- Construction of Water and Wastewater Treatment Systems
New Construction
Results
Phoenix, AZ 85085

Wastewater Aerator Repair - Silverbell
Results
Marana, AZ 85653

Central WWTP Improvements Phase 2
Renovation
Construction
$2,500,000 est. value
Buckeye, AZ

Transfer Station
New Construction - 10,500 SF
Pending Verification
Gilbert, AZ

Northern Wastewater North Gateway Infrastructure - WS90500236 - City of Phoenix
New Construction
Pending Verification
$6,778,010 CJ est. value
Phoenix, AZ 85032

Jomax Water Reclamation Facility Expansion - UT00388 - City of Peoria
Addition, Infrastructure
Conception
$65,499,546 CJ est. value
Peoria, AZ 85383

Wastewater Treatment Plant Headworks Improvements
Renovation
Design
Prescott Valley, AZ

Last Updated 09/16/2022 06:33 AM
Project Title

GRCA 229058 Rehabilitation of the North Rim Waste Water Treatment Plant (WWTP) Valves, Pumps, and Headworks

Physical Address View project details and contacts
City, State (County) Grand Canyon, AZ 86023   (Coconino County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $992,317 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Sep 14, 2022 Contract Award Number: 140P1522C0015 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: G1DMJZKBDRZ5 Contractor Awarded Name: GUARDIAN CONSTRUCTION, INC. Contractor Awarded Address: Layton, UT 84041 USA Base and All Options Value (Total Contract Value): $992317.8 Synopsis: The Department of Interior, National Park Service (NPS), Arizona Major Acquisition Buying Office requires improvements the North Rim WWTP, that includes instrumentation upgrades, valve replacements, safety upgrades, roof structure with lighting, comminutor re-purposing, and pump replacements. The project is expected to be completed not later than 300 days from the Notice to Proceed (NTP) is issued. This requirement will be competed as a small business set-aside request for proposal. The North American Industry Classification System (NAICS) Code is 237110. The small business size standard, applicable to this project is $39.5 million. Proposals will be accepted from all responsive and responsible businesses. We anticipate issuing an Request for Proposal (RFP) approximately on 21 June 2022 at www.sam.gov, but all dates in this notice are subject to change. Any amendments applicable to the solicitation will be posted at the same site. To take advantage of business opportunities with the National Park Service and the Department of the Interior (DOI) you must register your firm with the System for Award Management (SAM) at www.sam.gov. NPS intends to award one firm fixed-price contract. In accordance with FAR 36.204(f), the magnitude for this project is between $500,000.00 and $1,000,000.00 Pre-proposal questions shall be submitted a minimum of 7 days prior to the due date and time for proposals. Submit questions only though email to both of the following: Contracting Officer, Connie Gordon, connie_gordon@nps.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents