Similar Projects
Murphy USA #6608 / Stillwater
Demolition, New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Stillwater, OK 74074

Grade, Drain, and Surface - US 177
Infrastructure
Design
$8,480,000 CJ est. value
Stillwater, OK 74074

Utilities - SH 51
Infrastructure
Design
$1,000,000 CJ est. value
Stillwater, OK 74074

Lagoon Dredging and Dewatering
Infrastructure
Bidding
$1,882,546 CJ est. value
Stillwater, OK 74075

Courtyard Hotel and Event Center / Stillwater
New Construction, Infrastructure - 141,745 SF
Bidding
$30,000,000 CJ est. value
Stillwater, OK 74074

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Asphalt Overlay
Infrastructure
Post-Bid
$2,679,278 CJ est. value
Stillwater, OK 74074

Overlay of a Area With 2 Manhole Rings to Bring the Manholes Level With the Street
Infrastructure
Results
$40,900 CJ est. value
Glencoe, OK 74032

Resurface (Asphalt) - SH-51
Infrastructure
Results
$1,717,000 CJ est. value
Stillwater, OK 74074

Dutch Bros / Stillwater
New Construction, Infrastructure - 950 SF
Construction
$500,000 CJ est. value
Stillwater, OK 74074

Teal Ridge Estates Second Section
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Stillwater, OK 74074

Utilities - SH 18
Infrastructure
Design
$500,000 CJ est. value
Yale, OK 74085

South Thompson Avenue, Culvert Replacement Over Cottonwood Creek
Infrastructure
Post-Bid
$300,000 CJ est. value
Cushing, OK 74023

Bridge Rehabilitation - US-177
Infrastructure
Results
$931,277 CJ est. value
Stillwater, OK 74074

Widen and Resurface - SH 51
Infrastructure
Design
$17,510,000 CJ est. value
Stillwater, OK 74074

Last Updated 06/05/2023 10:34 AM
Project Title

Take 5 Express Car Wash & Oil Change / Stillwater

Physical Address View project details and contacts
City, State (County) Stillwater, OK 74074   (Payne County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Car Wash, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,700,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work and new construction of two car wash facilities. As of May 23, 2023, a general contractor has not yet been selected for this project. A firm construction timeline for this project has not yet been released. Trades being sought for this project include the following: Demolition, Site work, Utilities, Paving, Landscape/irrigation, Striping, Masonry, Steel/erection, Carpentry, Millwork, Roofing, Waterproofing, Doors/frames/hardware, OH doors, Storefront, Framing/drywall, Flooring, Painting, Accessories, Canopies, HVAC, Plumbing, Electrical

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents