Similar Projects
Splash Car Wash
New Construction - 5,800 SF
Construction
Bentonville, AR 72712

8Th Street Carwash
New Construction
Pending Verification
Rogers, AR 72756

Splash Car Wash
New Construction - 13,128 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Fayetteville, AR 72703

Splash Car Wash
New Construction - 8,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Bentonville, AR

Take 5 Express Car Wash & Oil Change
New Construction - 5,440 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Monticello, AR 71657

Last Updated 05/05/2022 12:30 PM
Project Title

Tidal Wave Auto Spa

Physical Address View project details and contacts
City, State (County) Springdale, AR 72762   (Washington County)
Category(s) Commercial
Sub-Category(s) Car Wash
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Car Wash, 1 Story Above Grade, Approximately 3,500 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents