Similar Projects
2022 TSPLOST Paving Improvements
Infrastructure
Design
$200,000 CJ est. value
Thomaston, GA 30286

2022 TSPLOST Paving Improvements
Infrastructure
Design
$200,000 CJ est. value
Thomaston, GA 30286

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Supplemental Drain - Thomaston Mills Reservoir Dam
Infrastructure
Post-Bid
Thomaston, GA

Public Art Memorial - Hilltop Zone
Infrastructure
Post-Bid
$150,000 est. value
Thomaston, GA 30286

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

2021 LMIG Project
Results
Mount Vernon, GA

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

TSPLOST Paving Improvement
Infrastructure
Results
$1,295,704 est. value
Thomaston, GA 30286

Spray Injection Road Patching Pothole Repair
Term Contract, Infrastructure
Post-Bid
GA

Agriculture Meter Installation
Infrastructure
Results

Intersection Improvements at Various Locations
Infrastructure
Results
GA

Last Updated 07/28/2022 04:05 PM
Project Title

2022 Resurfacing and Restoration Project

Physical Address View project details and contacts
City, State (County) Thomaston, GA 30286   (Upson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 28, 2022, website status is cancelled. No definite date for the rebid.** As of July 18, 2022. The County has decided to cancel the project until further notice. The project includes the resurfacing and associated work within the right-of-way of 12 roads in Upson County for a total of 12.51 miles of resurfacing. The 12 roads to be resurfaced are as follows: South Old Alabama Road (0.92 mi), Harp Road (0.65 mi), Mann Street (0.19 mi), Miller Street (0.18 mi), Clark Drive (0.18 mi), Chaney Street (0.08 mi), Thurston School Road (1.62 mi), North Delray Road (1.59 mi), Clay Street (0.24 mi) Jugtown Road (2.16 mi), E. Poplar Street (0.22 mi), and Rest Haven Road (4.49 mi). The project includes the restoration of the Hightower Library Parking Lot. The project includes the storm drainage replacement and roadway repair at Rocky Creek Road. The project includes roadway repairs at 6 locations. All bids must be accompanied by a Bid Bond in an amount not less than five percent (5%) of the Base Bid. Performance Bond and Payment Bond, each in the amount of one hundred percent (100%) of the contract amount, will be required of the successful bidder. Bonds must be written by an acceptable Surety Company licensed to do business in the State of Georgia and listed in the Department of the Treasury, Circular 570, latest edition. The successful bidder shall secure and pay for all permits, assessments, charges or fees required in connection with the proposed construction. Answers to all questions shall be provided a minimum of 72 hours prior to the time of the bid. All work to be performed under this project must be completed within 270 consecutive calendar days following receipt of Notice to Proceed. Upson County reserves the right to reject any or all bids, including without limitation, the right to reject any and all nonconforming, non-responsive, unbalanced or conditional bids and to reject the bid of any bidder whom Owner believes would not be in the best interest of the Project to make an award to that bidder whether because the bid is not responsive, the bidder is unqualified, or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents