Similar Projects
MPI DOT Paving Stevens Avenue - City of Portland
Infrastructure
Conception
$450,000 CJ est. value
Portland, ME 04103

Fore Street Sewer Separation - City of Portland
Infrastructure
Conception
$2,000,000 CJ est. value
Portland, ME 04101

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Stroudwater Apartments
New Construction, Infrastructure - 45,000 SF
Design
$13,000,000 CJ est. value
Westbrook, ME 04092

Cottage Road Pedestrian and Safety Improvements + Mill and Overlay
Infrastructure
Bidding
$700,000 CJ est. value
South Portland, ME 04106

Lewiston - Main Street Corridor Preemption Installations
Infrastructure
Bidding
Lewiston, ME 04240

2022 Bond - School Construction Projects - Cape Elizabeth School Department
New Construction, Infrastructure
Post-Bid
$115,900,000 CJ est. value
Cape Elizabeth, ME 04107

RFP Construction Manager at Risk - Front Street Redevelopment Construction Manager at Risk
Infrastructure
Post-Bid
$43,460,000 CJ est. value
Portland, ME 04103

Scattered Sites Redevelopment Construction Manager at Risk
Infrastructure
Results
$1,100,000 est. value
Portland, ME

Statewide Geotechnical Drilling
Infrastructure
Results

Stevens Square at Baxter Woods Apartments / Portland
New Construction, Infrastructure
Construction
$60,800,000 CJ est. value
Portland, ME 04103

York Street Mixed-Use Renovation
Renovation, Infrastructure - 9,620 SF
Construction
$5,000,000 CJ est. value
Portland, ME 04101

Summit Community Church
New Construction, Infrastructure - 28,000 SF
Pending Verification
$8,000,000 CJ est. value
Gorham, ME 04038

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Pending Verification
$825,000 CJ est. value
Lewiston, ME 04240

Legere Subdivision On Woods
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Gorham, ME 04038

Last Updated 12/06/2022 04:16 PM
Project Title

Midcoast Youth Hockey

Physical Address View project details and contacts
City, State (County) Topsham, ME 04086   (Sagadahoc County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Stadium
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 2022, the project is under review with the Planning Board for site plan approval extension. The project is in fundraising stages and waiting to start construction documents. A general contractor has been chosen, but their information hasn't been disclosed. A construction timeline hasn't been confirmed, but work is not anticipated to start until 2023.

Details

1 Story Above Grade, 28,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents