Similar Projects
Secondary Non-Potable Water Storage Facility - City Of Brentwood
Alteration
Conception
$3,500,000 est. value
Brentwood, CA 94513

Synthetic Natural Gas (SNG) Back-Up System
Infrastructure
Bidding
$2,000,000 est. value
Vacaville, CA 95687

Regional Wastewater Control Facility (RWCF) Digester Gas Pipeline Expansion Joints Replacement
Infrastructure
Bidding
$160,000 est. value
Stockton, CA

Above Ground Fuel Storage Tank
Infrastructure
Post-Bid
San Jose, CA

J045--Fuel Filtering/Underground Tanks / Generators
Term Contract
Post-Bid
Loma Linda, CA 92357

Propane Repairs at Death Valley National Park
Term Contract
Results
Death Valley, CA

Above Ground Fuel Storage Tank and Dispensing Systems
Alteration
Results
Auburn, CA

Wildfire Fuel Reduction in El Dorado County
Infrastructure
Bidding
Sacramento, CA

Fuel Tank Filtering and Cleaning
Term Contract
Post-Bid
Los Angeles, CA 91343

Fuels Tank Inspection EDW
Term Contract
Results
Edwards, CA

Fuel Filtering, Tank Cleaning and Lab Testing
Term Contract
Post-Bid
Long Beach, CA 90822

Diesel Underground Storage Tank Removal
Demolition
Results
Oceanside, CA

Maintenance of Natural Gas Pipeline
Alteration
Post-Bid
Herlong, CA 96113

Fuel Pump and Tank Certification Repair Services
Infrastructure
Results
CA

Replacement of Diesel Fuel Dispensing Equipment at Corporation Yard
Infrastructure
Post-Bid
Merced, CA

Reported 06/22/2022 12:00 AM
Project Title

Leadership Public Schools - Gas Line Relocation

Physical Address View project details and contacts
City, State (County) Hayward, CA 94545   (Alameda County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All traffic control for own work All offsite demo, pavement, and restoration Onsite trenching and backfill as required per PG&E GreenBook Existing gas line assumed to be 2" steel pipe at point of connection Furnish and install (3) sets of gas pressure regulated valves per C2.01. Furnish and install new steel 1-1/4" gas line and new gas line Furnish and install new gas cage per PG&E GreenBook Standards Furnish and install Little FireFighter Seismic Shut Off Valve (assume 1-1/4" OD) Offsite trenching, trench plating, and backfill as required per PG&E GreenBook Subcontractor will be required to be onsite for all PG&E inspections and unplating while PG&E is onsite. All onsite/offsite trenching and trench plating for work stated above All inspections provided directly by DSA Inspector Contractor to pull encroachment permit

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents