Similar Projects
Gardner Transmission Main Replacement Project
Infrastructure
Bidding
$827,000 est. value
Gardner, MA

Charlton Police Department Water Service Connection Project
Infrastructure
Bidding
$76,000 est. value
Charlton, MA 01507

Ductile Iron Pipe and Associated Fittings
Infrastructure
Post-Bid
$60,000 est. value
Spencer, MA 01562

Unidirectional Flushing of approximately 70 miles of the Towns Water Mains.
Infrastructure
Post-Bid
$310,000 est. value
Shrewsbury, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

New Water Main at NCCI Gardner
Results
Less than $1,000,000 est. value
Gardner, MA 01440

Replacement of the Existing Waterline
Infrastructure
Post-Bid
$704,150 est. value
Sturbridge, MA 01566

Water Main Replacement at MWCC Fitness Center
Results
$85,000 est. value
Gardner, MA 01440

Walnut Street Phase 2 and Canal Street Infrastructure Improvements Schedule A & B
Infrastructure
Post-Bid
$964,000 est. value
Athol, MA

Quabbin Aqueduct Shaft 2 Repairs
Results
Holden, MA

New Water Main in and Around Newton Street
Infrastructure
Post-Bid
Southborough, MA 01772

Water Meters/DPWP
Term Contract
Results
Worcester, MA

PFAS Raw and Finished Water Main Project
Infrastructure
Post-Bid
$2,900,000 est. value
Dudley, MA

2021 Water Main Replacement Project
Results
Less than $1,900,000 est. value
Webster, MA 01570

Water Main Replacement
Infrastructure
Post-Bid
Southborough, MA

Last Updated 05/09/2022 06:37 AM
Project Title

Water Main on the Following Streets - Gilboa Street, North Street and Lackey Dam Road

Physical Address View project details and contacts
City, State (County) Douglas, MA 01516   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. This project includes the upgrade of approximately 5,600 feet of 12-inch water main and 1,300 feet of 16-inch water main on the following streets: Gilboa Street, North Street and Lackey Dam Road. This project consists of furnishing all tools, labor, and equipment to necessary for the removal and installation of various size water mains and appurtenances including gate valves, valve boxes, hydrants, services and temporary bypass piping, and for testing and chlorination. This project includes the transportation of the pre-purchased and stored materials to the project site for installation. The project also includes furnishing and installing the temporary bypass piping, backfill materials and trench pavements.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents