Similar Projects
1206 Flora St. Electrical Installation For 2Nd Floor Mechanical Equipment
Alteration
Bidding
Columbia, SC

PVI Replacement Water Heaters at Kelly Mill Middle and Joseph Keels Elementary
Alteration
Bidding
Blythewood, SC 29016

Indefinite Delivery Contract - Mechanical/Plumbing Services
Post-Bid
Charleston, SC 29401

Philip Street Building Automation System (BAS) and HVAC(VAV/FP) Replacement Project
Post-Bid
Charleston, SC 29401

Health Department Boiler Replacement
Results
Spartanburg, SC 29303

H246--Boiler-Tower Water Chemical Treatment
Results
Charleston, SC 29403

Replacement of Boilers - Joseph Floyd Manor
Alteration
Bidding
Charleston, SC

PVI Water Heater Replacement
Post-Bid
Blythewood, SC 29016

Water Treatment Service
Results
Charleston, SC 29412

Water Treatment Program
Term Contract
Post-Bid
Charleston, SC 29409

Roof and Mechanical Unit Replacement
Results
Folly Beach, SC 29439

Furnish and Deliver New Hot Water Heaters as Specified
Post-Bid
Lexington, SC 29072

Kirkland Correctional Institution - Boiler Replacement
Results
$680,000 to $739,725 est. value
Columbia, SC

Cooling Tower Replacement for TFF Site Preparation Project
Post-Bid
Aiken, SC 29808

Water Treatment Services
Term Contract
Results
Columbia, SC 29201

Reported 10/19/2021 12:00 AM
Project Title

Walk In Cooler at Williston Elko Middle School

Physical Address View project details and contacts
City, State (County) Williston, SC   (Barnwell County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: 11'7 x 9'8 1/2 walk in cooler with roof cap, 1 hp consendsing unit, 12,500 btu evaporator, Tubing, flex, refrigerant, disconnects, misc materials, labor, freight. tax 8% , remove old walk in cooler.

Details

Division 11 - Equipment, Foodservice Storage Equipment, Walk-In Freezers.
Division 13 - Special Construction, Controlled Environment Rooms, Cold Storage Rooms, Walk-in Coolers, Walk-in Freezers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents