Similar Projects
Hightower Road and Cooper Road NE - Grading, Drainage, Base and Paving
Infrastructure
Bidding
Valdosta, GA

East Augusta Roadway and Drainage Improvements
Infrastructure
Bidding
Augusta, GA 30901

Hanarry Point Drainage Improvement Project
Post-Bid
Lawrenceville, GA 30045

Repair of Storm Water Drainage Systems
Post-Bid
Snellville, GA 30078

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

Turner County 2018 CDBG - Legg Road
Results
Less than $430,000 est. value
GA

Detention Pond Rehabilitation/Reconstruction - 2 Sites
Infrastructure
Bidding
Lawrenceville, GA 30046

Street and Drainage Improvements Flint Drive
Post-Bid
Less than $360,000 est. value
Douglas, GA

Revetment Rehabilitation
Results
Brunswick, GA

Shoals Street Drainage and Street Improvements
Infrastructure
Bidding
Warrenton, GA

2020 LMIG Projects
Post-Bid
Darien, GA 31305

Arglass Road - Grading, Drainage, Base and Paving
Results
Less than $789,567 est. value
Remerton, GA 31601

Pre-Qualification of Contractors for the Mulberry River Stream Restoration Project
Infrastructure
Bidding
$2,200,000 est. value
Braselton, GA

First Street Resurfacing, Street, Water Extension
Post-Bid
Richmond Hill, GA 31324

Street and Drainage Improvements to Cottonwood Road
Results
Douglas, GA 31533

Last Updated 07/20/2021 04:25 PM
Project Title

Storm Drainage Improvements - FY2018 CDBG

Physical Address View project details and contacts
City, State (County) Irwinton, GA   (Wilkinson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Storm drainage improvements including installation of approximately 126 linear feet of 5' × 3' reinforced concrete box culvert, approximately 90 linear feet of 2'× 3' box culvert, and construction / re-grading of approximately 2,600 linear feet of ditches, all work complete with paving and erosion control.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents