Similar Projects
Existing Retail Facility Renovation
Renovation
Conception
Moorhead, MS

College of Architecture Art & Design
New Construction
Conception
Mississippi State, MS

Maintain Exterior Coatings of Various Facilities, Phase 3
Term Contract
Design
$500,000 to $1,000,000 est. value
Biloxi, MS 39534

New Boiler Room Construction
New Construction
Design
Jackson, MS

Pearl River Community College Aviation Aerospace Workforce Academy
New Construction - 29,800 SF
Bidding
$300,000 est. value
Kiln, MS 39556

HEERF III - HVAC Updates for COVID Prevention Engineering Intervention - Part Three (Culinary Arts Renovations)
Renovation
Bidding
$1,200,000 CJ est. value
Jackson, MS 39201

2021 Summer Classroom Modifications
Renovation
Post-Bid
Oxford, MS

Leland Canopy Repair
Post-Bid
$150,000 est. value
Leland, MS 38756

Student Services Building
New Construction
Results
$15,000,000 est. value
Clarksdale, Jackson, MS 38614

Student Services Building
New Construction
Results
$15,000,000 est. value
Clarksdale, Jackson, MS 38614

Rowan Hall Second Floor Renovation
Renovation
Construction
$463,700 est. value
Lorman, MS 39096

Culinary Arts Building MUW
New Construction
Construction
$15,000,000 est. value
Columbus, MS 39701

New Career Technical Complex
New Construction - 350,000 SF
Conception
Booneville, MS

Exterior Weatherproofing Main Hospital
Alteration
Design
$5,000,000 to $10,000,000 est. value
Jackson, MS 39216

Entrance Improvements for Pecan Ridge Project
Alteration
Bidding
$75,000 est. value
Brandon, MS 39047

Last Updated 07/21/2022 03:08 PM
Project Title

Soffit - Fascia Replacement PHASE 5 (REBID)

Physical Address View project details and contacts
City, State (County) Gulfport, MS 39507   (Harrison County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Finishes/Exterior
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Single stipulated sum bids will be received for all work required by the Contract Documents in accordance with the Instructions to Bidders. Interested bidders should log-in or register for a free account to view and/or order Bid Documents. All plan holders are required to have a valid email address for registration. The cost of the bid documents is non-refundable and must be purchased through the website (digital and hard copies). Questions regarding website registration and online orders please contact Plan House at (662) 407-0193 or Central Bidding at (225) 810-4814. All proposals must be on file with the College prior to the opening time as stated above. All proposals must be sealed and clearly marked on the outside of the envelope as indicated "Soffit & Fascia Replacement - Phase 5 (REBID)" to be opened on "{Contractor to insert bid date here}". Envelopes not so marked are submitted at the risk of the Bidder and the College assumes no responsibility for the premature opening of same by any College employee. At the Bidders option, in lieu of submitting a physical sealed Bid, electronic bids may be submitted at website. Bids shall be received electronically until the date/time as stated above. For any questions relating to the electronic bidding process, please call Central Bidding at 225-810-4814. Electronic submittal of Bids is not required. The Owner reserves the right to waive any informalities and to reject any or all bids. Each bidder must deposit with his bid (or upload at Bidders Option), security in the amount, form and subject to the conditions provided in the Instructions to Bidders. Performance and Payment Bonds will be required from the successful bidder. Bidders shall comply with the law of the State of Mississippi requiring a Certificate of Responsibility. Resident contractors shall, in accordance with laws of the State of Mississippi, be granted preference over non-residents in the award of this contract in the same manner and to the same extent as provided by the laws of the state of domicile of the non-resident. A non-resident contractor shall attach to his proposal a copy of his resident state's current law pertaining to such state's treatment of non-resident contractors. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents