Similar Projects
Harvest Meadows Phase Two - Water, Wastewater and Drainage Improvements
Post-Bid
Buda, TX 78610

Construction Package #3 - Waterline Improvements & ARV Installation
Post-Bid
Less than $3,360,000 est. value
San Marcos, TX 78666

Main Lift Station Force Main Replacement
Results
$7,400,000 est. value
San Marcos, TX 78666

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Sunfield Phase 3 Section 5C Street Improvements and Sunfield Phase 3 Section 5C Drainage, Water, Wastewater, and Utility Improvements
Post-Bid
TX

Sportsplex Wastewater Line Upsize Project
Results
Less than $253,902 est. value
Buda, TX 78610

Parten Ranch, Phase 5 Paving, Drainage, Water and Wastewater Improvements
Post-Bid
Dripping Springs, TX 78620

Hunter Road Pipeline Improvements and Nelson Transmission Line Project
Results
$690,000 est. value
San Marcos, TX 78666

2020 CCSUD TWDB Projects Scada Consultant Services
Post-Bid
San Marcos, TX 78666

Bunton Lane Water Line Relocation at Bunton Creek
Results
Uhland, TX 78640

Plum Creek Marketplace Avenue Phase 2 - Water, Wastewater, Drainage, and Paving Facilities
Post-Bid
TX

Trails at Windy Hill Phase Four and Five Paving, Drainage, Water and Wastewater Improvements
Results
TX

Driftwood Club Core Phases 1 and 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Cotton Gin Road Water Line Relocation - Phase 1
Results
Less than $150,000 est. value
Uhland, TX 78640

Driftwood Phase 1 Section 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Last Updated 06/25/2021 09:46 AM
Project Title

Piland Triangle Interconnect

Physical Address View project details and contacts
City, State (County) Austin, TX   (Hays County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,782,770
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of constructing approximately 3,500 linear feet of 24-inch water transmission main located from the intersection of FM 812 and Circuit of the Americas Boulevard/Piland Triangle Road (East) to the intersection of FM 812 and Piland Triangle Road/Burklund Farms Road.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents