Similar Projects
Design-Build Edinburg Pump Station Levee Rehabilitation
Design
$1,000,000 to $5,000,000 est. value
Hidalgo, TX

Sewer Lift Station Pump Replacements at the Ambrosio Guillen Texas State Veterans Home
New Construction
Bidding
$100,000 est. value
El Paso, TX 79924

Rehabilitation of Blackbeard Lift Station
Renovation
Bidding
$85,000 est. value
Jamaica Beach, TX

Upgrade of Serene Hills Lift Station
Post-Bid
Austin, TX 73301

Elmendorf Water Supply Project
Post-Bid
Elmendorf, TX 78112

Lift Station No. 1 Improvements
Results
$850,000 est. value
TX

Contract 2 - Booster Pump Station Improvements
Results
Less than $1,646,502 est. value
Mart, TX 76664

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Wood Trace Wastewater Treatment Plant - Phase 2 (0.270 MGD) and Lift Station Number 1 - Phase 2
New Construction
Bidding
TX

Wastewater Treatment Plant Rehabilitation and Lift Station Conversion
Post-Bid
$1,365,000 est. value
Katy, TX 77449

Fountain View Regional LS Construction and Abandonment of Westheimer No. 1 LS
Results
$21,957,065 est. value
Houston, TX

McKinney Ranch Pump Station Improvements Project
Renovation
Bidding
$13,500,000 est. value
McKinney, TX 75070

Travis Ranch 3F Lift Station Improvements
Post-Bid
Heath, TX 75087

Lift Station C Replacement
Results
Porter Heights, TX

Last Updated 09/11/2021 07:49 AM
Project Title

Bird Creek Basin Wastewater Projects

Physical Address View project details and contacts
City, State (County) Temple, TX   (Bell County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Obtained from a credible source, Awaiting verification
Bids Due View project details and contacts
Estimated Value $5,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Parts C & D are now planned for construction in FY 2022. All other proposed future improvements within the Bird Creek Basin focus to eliminate the intrabasin transfer of fl ows, the abandonment of four diff erent lift stations, and expansion of serviceable area in the far south of the basin. However, with recently completed improvements in this area, these projects are not currently prioritized within the 8-year planning window.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents